Telangana: Power supply around Balanagar, a prominent industrial and residential hub in Bhagyanagaram, and to those running industries will be disrupted on Sunday, March 8, 2026. This suspension is scheduled for the maintenance and urgent repair w0rk on power lines. This suspension will avoid burdening the transformers during that time, the Electricity Department is undertaking grid connection work and replacement of old wires in advance.
Electricity has announced this power cuts in two different times on Sunday. Check the timings and locations.
There will be power disruption in the areas where work is being carried out this morning. The details of the time and areas related to this are as follows. The entire Balanagar city area will be covered by this cut from 10:00 am to 1:00 pm. Areas under the 11 KV Srirama line and institutions like Srinivas Enterprises will be affected.
Power cuts will continue in some areas even after the lunch break. Companies in industrial estates will be particularly affected. From 2:00 pm to 5:00 pm, there will be no power in the areas of Pragati Pack Company, Uthren Company, NS Engineering Works, R&D Engineering, Balanode, Pooja Industries, Agro Industries till evening.