City
Epaper

Telangana: Transport hit as bridge's approach road in bad shape at Bhadradri Kothagudem

By ANI | Updated: August 20, 2020 23:30 IST

Amid the prevailing flood situation in the Kinnerasani, a tributary of the river Godavari, transportation was hindered near the Nagaram village in Palwancha mandal of Bhadradri Kothagudem district on Thursday.

Open in App

Amid the prevailing flood situation in the Kinneras, a tributary of the river Godavari, transportation was hindered near the Nagaram village in Palwancha mandal of Bhadradri Kothagudem district on Thursday.

The water in the Godavari river continues to flow above the warning level.

Officials observed that the Nagaram-Rangapuram bridge's approach road is not in good shape and are fearing that it may collapse due to the current of the floodwater.

District collector M V Reddy has appealed to the public to not venture out and postpone their journeys as the vehicular transport on the bridge is stopped.

Flash floods hit several other parts of Telangana in the past few days due to incessant rains.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

MumbaiMumbai Weather Update: Clear Skies With Maximum Temperature of 31 Degrees Celsius; AQI ‘Satisfactory’

TechnologyMusk seeks removal of OpenAI CEO Altman, Brockman amid legal battle

Other SportsIPL 2026: 'Jaiswal's biggest strength is self-belief,' says Rathour after RR beat MI

BusinessMusk seeks removal of OpenAI CEO Altman, Brockman amid legal battle

EntertainmentAditya Dhar credits Mukesh Chhabra for pushing him to think bigger on Dhurandhar, says "Casting can make or break film"

National Realted Stories

NationalJ-K: Two govt employees accused of terror activities terminated from service

NationalMamata Banerjee files nomination papers; proposers list reflects Bhabanipur’s cosmopolitan nature

NationalTelangana HC defers verdict to April 22 over Ghose Commission report on Kaleshwaram Lift Irrigation Project

NationalPMMY disburses over Rs 40 lakh crore via 57.79 crore loans

NationalJharkhand tender scam: Two retired engineers surrender before court, get conditional bail