City
Epaper

Three Amrit railway stations in Telangana ready for inauguration

By IANS | Updated: May 19, 2025 21:52 IST

Hyderabad, May 19 Three railway stations in Telangana have been developed as Amrit Stations and are ready for ...

Open in App

Hyderabad, May 19 Three railway stations in Telangana have been developed as Amrit Stations and are ready for inauguration along with 100 other stations across the country on May 22.

The Begumpet railway station in Hyderabad, along with Karimnagar and Warangal railway stations, have been developed as Amrit Stations under the Amrit Bharat Station Scheme.

According to the South Central Railway (SCR), elaborate facilities and amenities have been developed at the three railway stations at a total cost of Rs 77.81 crore.

The SCR officials on Monday briefed the media about the facilities and amenities that have been developed at the three stations.

At Begumpet, a new station building has been constructed with a 12-metre foot over bridge, lifts, escalators, and a waiting hall. Plans are afoot to develop a second entry at a cost of Rs 12 crore at Begumpet station, one of the important stations in the twin city region of Hyderabad, catering to the needs of both suburban and non-suburban passengers.

The foundation stone for redevelopment works was laid by Prime Minister Narendra Modi in February 2024.

As part of the Amrit Bharat Station Scheme, a total of 40 railway stations were identified to be developed with a cost of around Rs 2,750 crore.

Begumpet Railway Station has been taken up for redevelopment at a cost of Rs 26.55 crore. The station handles around 100 trains with a footfall of 15,000 rail users. A long-term master plan was prepared, envisaging the development of modern facilities.

Facilities developed at Begumpet include new station building along with waiting hall and booking office, Divyangjan facilities, modern toilets, improvements to circulating area, rock garden & small water fountain in circulating area, facade lighting, landscaping, additional platform shelter, platform resurfacing, sewage treatment plant, a 12-meter foot over bridge along with ramp, two lifts, and four escalators.

Karimnagar railway station has been developed as Amrit station at a cost of Rs 25.85 crore, and the foundation stone was laid in August 2023. The station handles 10 trains with a footfall of 1,000 rail users.

Warangal Station was taken up for redevelopment at a cost of Rs 25.41 crore, and the foundation stone was laid in February 2024. This station handles around 150 trains with a footfall of nearly 22,000 rail users.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

Other SportsMotoGP: Marquez masters rain to seal sensational Pole at Sachsenring

Other SportsWilliamson declares Kohli as the greatest all-format player seen in last 15 years

Cricket“Somebody’s Wife Is Calling”: Jasprit Bumrah’s Witty Reaction Goes Viral As Reporter’s Phone Rings During Press Conference at Lord’s (Watch Video)

NationalRozgar Mela a symbol of new India's youth empowerment: Union Ministers

MaharashtraNaigaon Tragedy: 15-Year-Old Boy Dies of Electric Shock While Retrieving Shuttlecock During Badminton Game; CCTV Footage Surfaces (VIDEO)

National Realted Stories

National16th Rozgar Mela: 72 candidates receive appointment letters in Chhattisgarh

NationalRozgar Mela: Beneficiaries hail PM Modi for uplifting youth and promoting transparent system

NationalHeavy rain alert in Rajasthan till July 15

NationalDalai Lama arrives in Ladakh for month-long stay after two years

NationalDelhi CM Rekha Gupta slams ex-CM Kejriwal for lack of interest in development