City
Epaper

MBVM Urges Urgent Infrastructure Development in Morbe Amid Major Highway Projects

By Amit Srivastava | Updated: June 18, 2025 18:41 IST

Navi Mumbai: While welcoming the rapid progress on the Delhi-Mumbai Expressway and the Virar-Alibaug Multimodal Corridor, the Marathi Bandhkam ...

Open in App

Navi Mumbai: While welcoming the rapid progress on the Delhi-Mumbai Expressway and the Virar-Alibaug Multimodal Corridor, the Marathi Bandhkam Vyavsayik Mahasangh (MBVM) has strongly urged the government to immediately take up road and infrastructure development in the Morbe area—set to become a key junction point for both projects. The association has demanded urgent construction of service roads, Development Plan (DP) roads, and a major 4-lane connector road between Morbe Interchange and Taloja MIDC to avoid future congestion and promote industrial growth.

MBVM praised the Central and State Governments for pushing forward two nationally significant projects, but cautioned that the lack of basic infrastructure in the strategically located Morbe area could undermine their benefits.

According to the association, the Vadodara-Mumbai Expressway ends near Morbe village in Panvel taluka, which will soon become a convergence point with the Virar-Alibaug Corridor—boosting traffic, industry, and residential activity.

Prakash Baviskar, General Secretary of the Federation, said,“The scale of traffic and economic activity in Morbe will increase dramatically once these corridors become operational. We appeal to CIDCO-NAINA and the government to begin work immediately on the required road infrastructure.”

Key demands include:

*Construction of a 6-km, 4-lane bituminous concrete (BC) road between Morbe Interchange and Taloja MIDC, to be developed as per CIDCO-NAINA’s approved DP and connected to JNPT and NMIA.

*Immediate commencement of all pending DP roads by CIDCO-NAINA and service roads by the government.

*Timely funding and approvals for the development project through Central-State coordination.

*Toll plaza planning to include local resident concessions and smooth access to smart townships and logistics clusters.

MBVM asserted that if these demands are met swiftly, the Morbe region could emerge as a major economic hub and ensure smooth connectivity without traffic chaos as the expressways become operational.

Tags: Delhi-Mumbai ExpresswayVirar-alibaug corridor projectNainaCidcoRoad and transportNavi Mumbai News
Open in App

Related Stories

Navi MumbaiNavi Mumbai Airport Connectivity Woes: Passengers Complain of High Taxi Fares, Poor Accessibility

MumbaiMumbai Local Train Update: CSMT-Bound Trains Delayed Between Kharghar and Nerul Stations

CricketMaharashtra Plans 1 Lakh-Capacity Cricket Stadium in Navi Mumbai

Navi MumbaiNavi Mumbai: Mango Lovers Rejoice! Alphonso Prices Crash in Vashi's APMC Market

Navi MumbaiNavi Mumbai: Sagar Naik to Move Court Over NMMC Retirement Age Proposal Suspension

Navi Mumbai Realted Stories

MaharashtraMaharashtra Student Neelam Shinde Dies in US After 14 Months in Coma; Family Fulfils Her Last Wish

MumbaiDhurandhar 2 Leaked: Maharashtra Cyber Police Registered Case Over Leak of Aditya Dhar’s Film ‘Dhurandhar - The Revenge’ on Telegram

MumbaiMumbai: 25 Motorcycles Set On Fire in Dharavi; Case Registered

MumbaiMaharashtra Cyber Cell Busts Fake Currency Racket Operated via Instagram; Two Arrested

MumbaiMumbai: Man Sets Fire to Nameplate Near Kirit Somaiya’s Office in Mulund After Gym Dispute; Video Surfaces