City
Epaper

Navi Mumbai: Civic Chief Reviews Flood Mitigation Measure at Dharan Lake After Belapur Waterlogging

By Amit Srivastava | Updated: June 19, 2025 09:46 IST

Navi Mumbai: Following the severe waterlogging in low-lying areas of Sector 4, 5, 6, and 11 in CBD Belapur ...

Open in App

Navi Mumbai: Following the severe waterlogging in low-lying areas of Sector 4, 5, 6, and 11 in CBD Belapur during the high tide and heavy rainfall on May 26, 2025, Municipal Commissioner Dr. Kailas Shinde had conducted a late-night emergency inspection at Dharan Lake and issued immediate flood mitigation instructions.

Acting on the Commissioner’s orders, the engineering department implemented several emergency measures. To assess the effectiveness of these actions and ensure sustainable long-term solutions, Dr. Shinde inspected the Dharan Lake site once again today for a detailed review.

During the inspection, Dr. Shinde examined the pumping house where an additional water extraction pump had been installed on the night of the incident. A backup generator has also been deployed, and the construction of a new pump house is being fast-tracked.

LokmatTimes.com had reported the root cause of the flooding — a temporary bund constructed to prevent high tide seawater from entering the holding pond had inadvertently blocked rainwater from draining into the sea during the downpour. Civic authorities reportedly failed to dismantle the bund in time, causing the holding pond to overflow and flood adjacent city areas.

Dr. Shinde was accompanied during the inspection by City Engineer Shirish Aradwad, Additional City Engineer Arvind Shinde, Zone 1 Deputy Commissioner Somnath Potre, and other senior civic officials.

With water from four different streams flowing into the Dharan Lake, the Commissioner has instructed that the surrounding terrain be leveled to increase the lake’s holding capacity. He also emphasized the need for regular desilting near the pipe outlets close to the flap gate wall to ensure uninterrupted water discharge and prevent future blockages.

Tags: Flood controlNavi mumbai municipal corporationBelapurMonsoon 2025Rain NewsNavi Mumbai News
Open in App

Related Stories

Navi MumbaiNavi Mumbai: Panvel GRP Arrests UP Man for Stalking Ex-Girlfriend Inside Mumbai-Bound Local Train

Navi MumbaiNavi Mumbai International Airport Starts Commercial Flights; 15 Departures on Inaugural Day, 40 Expected by January-End

Navi MumbaiNMIA Operations To Begin Tomorrow: Travelling to Navi Mumbai Airport on Day One? Here Are the Best Routes From South Mumbai

CricketIND vs SA 5th T20I: Will Fog or Rain Play Spoilsport in India vs South Africa Match in Ahmedabad? Check Weather and Pitch Report

Navi MumbaiNavi Mumbai Cybercrime: Schoolteacher Loses Nearly ₹24 Lakh After Downloading Fake ‘RTO Challan’ APK in Kamothe

Navi Mumbai Realted Stories

MumbaiMumbai Local Train Mega Block on December 28, 2025: Services to Be Affected on Central, Harbour and Western Lines on Sunday; Check Details

MumbaiMumbai Weather Update: AQI Nears 200 PM2.5 and PM10 Spike Sparks Health Concerns Across City, Temperature Hovers Near 22 Degrees

MumbaiMumbai Local Train Update: Weekend Maintenance at Borivali Station to Disrupt Fast and Suburban Services Till December 29

MumbaiMumbai Police Withdraw Security Cover for Filmmaker Hansal Mehta, Salman Khan’s Manager Prashant Gunjalkar

MumbaiMumbai: Man Generates Fake Local Train Pass Via ChatGPT ; FIR Registered