City
Epaper

Navi Mumbai Traffic Update: Sion-Panvel Highway to Remain Closed for 7 Hours on March 6 for Bridge Repairs; Check Alternate Route

By Amit Srivastava | Updated: March 4, 2025 20:54 IST

Navi Mumbai – The Navi Mumbai Traffic Police have announced a complete seven-hour closure of the Sion-Panvel Highway between Sanpada ...

Open in App

Navi Mumbai – The Navi Mumbai Traffic Police have announced a complete seven-hour closure of the Sion-Panvel Highway between Sanpada Bridge and Turbhe Bridge on March 6, 2025. The restriction is necessary to facilitate repair work on the Sanpada Pedestrian Bridge.

The Public Works Department will carry out the repairs on March 6, 2025, from 11:00 PM to 6:00 AM. To prevent congestion and ensure public convenience, the highway will remain fully closed between Sanpada Bridge and Turbhe Bridge during this period.

The Sanpada Pedestrian Foot Over Bridge (FOB) on the Sion-Panvel Special State Highway sustained severe damage on February 8, 2025, between 2:00 AM and 3:00 AM, due to a collision with a dumper. As a result, the steel structure and railings have bent, and some sections have broken.

Pedestrian access to the bridge has been temporarily suspended; however, until complete repairs are carried out, it will pose a safety risk to the public. In light of the damages, repair work is scheduled to commence.

Alternative Route:

Vehicles traveling from Mumbai should take a left turn after Vashi Bridge and proceed via Palm Beach Road – Moraj Killa Junction to reach their destination.

The restrictions do not apply to police vehicles, fire brigades, ambulances, government vehicles, and other essential services. Commuters are advised to plan their travel accordingly.

 

Tags: Navi Mumbai Traffic UpdateTraffic AdvisoryNavi Mumbai Traffic DepartmentSion-Panvel highwaySanpada
Open in App

Related Stories

Navi MumbaiNavi Mumbai Traffic Update: Vehicular Restrictions in Rabale From May 3 to June 1 for Mulund-Airoli Creek Bridge Work

Navi MumbaiNavi Mumbai Traffic Update: Heavy Vehicle Entry & Parking Banned for A.R. Rahman Concert

Navi MumbaiNavi Mumbai Traffic Alert: Major Traffic Restrictions Near D.Y. Patil Stadium for A.R. Rahman Show on May 3, Check Alternate Routes

MumbaiMumbai Pune Expressway Traffic: Massie Vehicular Jam on Yashwantrao Chavan Expressway Due to Long Holiday Weekend

MumbaiMumbai Traffic Update: Bumper-to-Bumper Jam on Western Express Highway Due to Two Separate Accidents Near Andheri Bridge

Navi Mumbai Realted Stories

MumbaiMumbai: BMC Hospitals To Get New Tesla MRI Machines

ThaneThane Horror: Woman Allegedly Hangs Herself and Daughters While Husband Was at Work In Bhiwandi

NashikNashik: Parents Stage Protest at School in CIDCO Uttamnagar for Withholding Results Over Fees

NashikNashik Heatwave: Temperatures Soar Above 40 Degree Celsius; Storms Likely in Coming Days

PunePune Car Accident: One Killed After Mercedes-Benz Falls Off Wadgaon Bridge and Collides With Bike on Bengaluru–Pune Highway