City
Epaper

After Cong, BJP also 'red flags' Kerala's Silver Line project

By IANS | Updated: October 23, 2021 08:00 IST

Thiruvananthapuram, Oct 23 After the Congress-led UDF team, which was given the task of studying the Rs 63,941 ...

Open in App

Thiruvananthapuram, Oct 23 After the Congress-led UDF team, which was given the task of studying the Rs 63,941 crore Silver Line (K-Rail) project, a state of the art joint venture of the Indian Railways and the Kerala government said that this is an unviable project and should not be allowed to go forward, the BJP's state unit on Friday has also come out strongly against it.

State BJP president K. Surendran said it has now been proved beyond doubt that this project will do no good for the state.

"The need of the hour is (Chief Minister Pinarayi) Vijayan should see that steps are taken to drop this project as this is not going to help the state in any manner. All are surprised on why Vijayan is determined on going forward with this very expensive project. He should see that a discussion be mooted with Metroman E.Sreedharan on what's best for Kerala. Vijayan is doing everything to pressurise the Centre to clear the project and the Kerala BJP will do everything to see that this project does not take place," he said.

This is one of the Chief Minister's pet project - setting up a 529.45 km corridor connecting Thiruvananthapuram to Kasaragod.

A semi high speed train will be able to travel this stretch in a matter of 4 hours at an operational speed of 200 km per hour.

These trains will cover the busy Thiruvananthapuram-Ernakulam stretch in 90 minutes, as against the present over four hours.

Silver Line will be running parallel to the existing railway line from Kasaragod to Tirur, while an alternative green-field alignment has been chosen for Tirur- Thiruvananthapuram stretch.

Vijayan had mooted this project in his first term (2016-21) and it is presently lying before the Centre.

Incidentally this fresh opposition comes at a time, when the ongoing Assembly session has already been told by Vijayan that the project will be taken up.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: UDFIndian RailwaysMinistry of indian railwaysIndian railways ministryIndian railway networkBangladesh railwaysThe indian railwaysMumbai suburban network of railwaysIndian railways railwaysBangladesh railways ministry
Open in App

Related Stories

MumbaiMumbai–Ahmedabad Karnavati Express to Operate from Bandra Terminus Till April 27 – Check Route and Other Details

NationalGovernment Announces Free Train Travel for Gallantry Award Winners and Their Families

MumbaiMumbai: ‘No Services Cancelled,’ Central Railway Responds To MNS Over Dadar–Ratnagiri Train Changes

MumbaiMumbai–Madgaon Special Trains Announced for the Summer Holiday Season; Check Timings and Details Here

NationalWhy Do Railways Confirm High Waiting Tickets But Reject Low Ones?

Politics Realted Stories

Politics"Coordinated attack": Raghav Chadha denies allegations after removal as AAP Rajya Sabha Deputy Leader

PoliticsUttarakhand CM Dhami inaugurates "Doon Book Festival-2026" in Dehradun

Politics"Fearless and courageous": Rahul Gandhi praises Keralam women, promises safety measures

Politics"How can LDF ask for 3rd term when they messed up last 2?": Shashi Tharoor

PoliticsWill give Rs 5,000 allowance to all those BJP workers who are