City
Epaper

Bengaluru Suburban Railway: Approval for Phase 2 of additional 452 km sought from Railways Ministry

By IANS | Updated: July 24, 2023 21:25 IST

Bengaluru, July 24 The Karnataka Rail Infrastructure Development Company Ltd (K-RIDE) has prepared a new proposal of ...

Open in App

Bengaluru, July 24 The Karnataka Rail Infrastructure Development Company Ltd (K-RIDE) has prepared a new proposal of 452-km length to extend the Bengaluru Suburban Rail Project (BSRP) to nearby cities and towns and has sought the approval of the Railways Ministry to conduct the pre-feasibility study, a state government statement said.

Large and Medium Industries and Infrastructure Development Minister M.B. Patil said that the new proposal puts forth the plan to extend the BSRP network to Kolara, Tumakuru, Mysuru, Bangarapete, Hosuru, and Gauribidanur cities.

As per the proposal, the extension would be considered as Phase 2 and the total length is 452 km. It proposes extending the facility from Devanahalli to Kolar along Corridor 1 (107 km), Chikkabanavara to Tumkur via Dabaspet along Corridor 2 (55 km), Kengeri to Mysuru along Corridor 3 (125 km), and Whitefield to Bangarpete along Corridor 3 (45 km), Heelalige to Hosuru along Corridor 4 (23 km) and Rajanukunte to Gauribidhanuru via Doddaballapur along Corridor 4 (52 km).

Besides, it proposes a new 'Corridor 2A' from Chikkabanavara to Magadi (45 km).

The existing project of the BSRP has 4 corridors covering a length of 148.17 km. It comprises KSR Bengaluru City to Devanahalli (Corridor 1, 41.4 km), Baiyappanahalli to Chikkabanavara (Corridor 2, 25.01 km), Kengeri to Whitefield (Corridor 3, 25.01 km), and Heelalige to Rajanukunte (Corridor 4, 46.25 km).

Patil had advised the officials of K-RIDE during the BSRP review meeting held in early June to prepare a revised proposal extending the BSRP to include the above-mentioned places. This would facilitate hassle-free commutes for the people and enable industrial development in the region, he had opined.

While seeking the approval of the Ministry it has been mentioned that the Commissioner, DULT (the nodal authority to regulate and coordinate urban mobility initiatives in the Bengaluru Metropolitan Area) had also suggested K-RIDE to consider extending the current BSRP network from Heelalige to Chandapura, Kengeri to Nadaprabhu Kempegowda layout (BDA), Challaghatta and further suggested to start the process of preparing DPR for the extension of suburban rail to satellite towns.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: congresspitrodadelhimodideepikabjpwest-bengaldeepika-padukoneajay-devgnthakur
Open in App

Related Stories

NationalDelhi Water Cut: Supply To Be Disrupted for 5-Hour in Dwarka, Uttam Nagar, Janakpuri On April 24; Check Timings

MumbaiMumbai: Case Registered Against Organisers of BJP Rally in Worli Over Rule Violations

MumbaiGujrat ATS Busts Anti-National Conspiracy, Two Arrested from Gujarat and Mumbai

EntertainmentDeepika Padukone to Continue Shooting after Second Pregnancy News Reveal Breaks the Internet

NationalDelhi Firing: 34-Year-Old Man Shot Dead in Preet Vihar Over Parking Dispute, Search On for Accused

Politics Realted Stories

Politics"Elections have been peaceful": Union Minister Sukanta Majumdar says BJP set to secure at least 100 seats

PoliticsDelink women's quota from seat addition, implement it as is: UBT Sena MP Priyanka Chaturvedi

PoliticsHimachal: Jai Ram Thakur joins BJP women's protest march in Shimla, targets Congress

PoliticsPM Modi takes 99-year-old voter as inspiration to urge youth participation in voting

PoliticsCPI(M) leader urges Himachal CM to drop KNH relocation plan; women's group ends protest