City
Epaper

Cabinet clears 7 railway projects to add 2,339 km to existing network

By IANS | Updated: August 16, 2023 17:50 IST

New Delhi, Aug 16 The Union Cabinet on Wednesday cleared seven railway projects with an estimated cost of ...

Open in App

New Delhi, Aug 16 The Union Cabinet on Wednesday cleared seven railway projects with an estimated cost of Rs 32,500 crore, which will add 2,339 km to the existing network covering states namely Uttar Pradesh, Bihar, Jharkhand, West Bengal, Telangana, Odisha and Gujarat.

The projects, which include upgradation of the existing railway lines including their quadrupling and doubling, will facilitate capacity generation for movement of 120 million tonnes of extra cargo and will also help travel of migrant workers and students, Railway Minister Ashwini Vaishnaw told reporters after the Cabinet meeting.

The projects will receive 100 per cent funding from the Central government and connect major industrial and commercial hubs of the country.

They will help increase the existing line capacity, smoothen train operations, reduce congestion and facilitate ease of travelling and transportation, the minister said.

The details of the projects are as follows: Doubling of existing Gorakhpur Cantonment (Valmiki Nagar single line section) in Uttar Pradesh (Gorakhpur, Maharajganj, Kushi Nagar) for 89.264 km, and Bihar (West Champaran) for 6.676 km.

Doubling of existing Guntur-Bibinagar single-line section in Andhra Pradesh (Guntur) for 1 km, and Telangana (Nalgonda, Yadadri Bhuvanagiri) for 139 km.

Doubling of existing Chopan-Chunar single-line section in Uttar Pradesh (Mirzapur, Sonbhadra) for 101.58 km.

Doubling between Mudkhed-Medchal and Mahbubnagar-Dhone section in Maharashtra (Nanded) for 49.15 km, Telangana (Nizamabad, Kamareddy, Medak, Wanaparthy, Jogulamba, Medchal-Malkajgiri) for 294.82 km, and Andhra Pradesh (Mahbubnagar, Kurnool and Dhone) for 73.91 km.

Quadrupling between Samakhiali and Gandhidham in Gujarat (Kutch) for 53 km.

Third line between Nergundi-Barang and Khudra Road-Vizianagaram in Odisha (Bhadrak, Jaipur, Khordha, Cuttack, and Ganjam) for 184 km, and Andhra Pradesh (Srikakulam, Vizianagaram, Visakhapatnam) for 201 km.

Son Nagar-Andal multi-tracking project in Bihar (Gaya, Aurangabad) for 132.57 km, Jharkhand (Dhanbad, Giridih, Hazaribagh, Koderma) for 201.608 km, and West Bengal (Paschim Bardhman) for 40.35 km.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: congresspitrodadelhimodideepikabjpwest-bengaldeepika-padukoneajay-devgnthakur
Open in App

Related Stories

NationalWho Is Matheus Ferrero? Rahul Gandhi Claims Brazilian Model Voted 22 Times in Haryana

NationalDelhi Shocker: Young Man Brutally Killed by Three Men, Two Arrested, One Absconding

CricketIndia Women’s Cricket Team Gets Grand Welcome in Delhi After Historic ICC Women’s World Cup 2025 Win; To Meet PM Modi on November 5 (VIDEO)

CricketPM Modi Likely to Meet World Cup-Winning Indian Women’s Cricket Team on November 5: Report

NationalCoimbatore Shocker: Three Men Kidnap and Rape College Student Near Airport Area; Police Launch Manhunt for Accused

Politics Realted Stories

NationalGujarat Cabinet Expansion: BJP President JP Nadda To Discuss Cabinet Reshuffle With CM Bhupendra Patel Today

NationalPrashant Kishor's Jan Suraaj Party Announces List of 51 Candidates for Bihar Assembly Elections 2025

MumbaiAmeet Satam Appointed As Mumbai BJP President Ahead of BMC Polls

Maharashtra'Chaddi Baniyan' Protest at Maharashtra Assembly: Opposition Stages Agitation Against Sena MLA for Punching and Slapping Canteen Staff (Watch Video)

MaharashtraMaharashtra Monsoon Session: Ajit Pawar Slams Bhaskar Jadhav Over Fund Allegations, Says 'No Need for Unsolicited Advice'