City
Epaper

Over 78 pc Indian Railways tracks upgraded for speed of 110 kmph & above: Vaishnaw

By IANS | Updated: July 25, 2025 17:24 IST

New Delhi, July 25 Over 78 per cent of railway tracks in the country have now been upgraded ...

Open in App

New Delhi, July 25 Over 78 per cent of railway tracks in the country have now been upgraded for speeds of 110 kmph and above, with the improvement in the Indian Railways network carried out in a big way during the last 10 years, Railways Minister Ashwini Vaishnaw informed Parliament on Friday.

The minister said that the measures for track upgradation include the use of 60 kg rails, wider base concrete sleepers, thick web switches, longer rail panels, H Beam sleepers, modern track renewal and maintenance machines,

The track length for the highest speed potential of 130 km per hour & above has been increased more than 4-fold from 5,036 km in 2014 to 23,010 km in 2025, which forms 21.8 per cent of the total track length. Earlier, this high-speed section was only 6.3 per cent of the total length, the minister said in a written reply to a question in the Rajya Sabha.

Similarly, the track length for speeds of 110-130 km per hour has been more than doubled from 26,409 km in 2014 to 59,800 km in 2025, which now constitutes a significant 56.6 per cent of the total track network.

Correspondingly, the length of track where the speed of trains is less than 100 km per hour has been reduced from 47,897 track km to 22,862. While earlier trains had to slow down to less than 100 km per hour on 60.4 per cent of the track network, this has now been reduced to 21.6 per cent, he added.

Vaishnaw further stated that Vande Bharat trains presently running over the Indian Railway network are semi-high speed train services with a design speed of 180 kmph and a maximum operating speed of 160 kmph. The average speed of the train depends upon the geometry of the track, stoppages en route, and maintenance work in the section..

The first prototype of the Vande Bharat Sleeper train set has already been manufactured. Based on the extensive field trials and the experience gained therein, the first rake of the Vande Bharat sleeper train is undergoing commissioning, the minister added.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

InternationalTrump calls NATO allies to impose major sanctions on Russia; stop buying oil

AurangabadParking contractor to be held responsible if two-wheeler stolen from GMCH premises Tender process for parking underway

Other SportsWorld Athletics C'ships: India's campaign off to poor start in race walk event

NationalDelhi Speaker Vijender Gupta hails index to evaluate legislative performance

Other SportsHong Kong Open: India shuttler Lakshya Sen storms into final for first time since last year

Technology Realted Stories

TechnologyIndia’s Next Leap in Surgical Robotics: Meril Unveils Mizzo Endo 4000 – The Advanced Soft Tissue Robotic System

TechnologyAMFI hails Sebi's move to ease IPO, mutual fund and FPI regulations

TechnologySmartwatch, fitness tracker may help detect abnormalities in pregnancy

TechnologyApple sees strong demand for ‘Made in India’ iPhone 17

TechnologyStudy claims artificial sweeteners can lead to faster cognitive decline