City
Epaper

Thane to Get 70-Acre Convention Centre & Viewing Tower; TMC Invites EOI

By Nirmeeti Patole | Updated: March 21, 2025 16:34 IST

The Thane Municipal Corporation (TMC) has decided to invite Expressions of Interest (EOI) from developers for a 70-acre convention ...

Open in App

The Thane Municipal Corporation (TMC) has decided to invite Expressions of Interest (EOI) from developers for a 70-acre convention centre and viewing tower project at Kasarvadavali, near the Kharbao and Coastal Road junction. This mega project, which involves an investment worth crores, requires a well-planned financial model, making the selection of an appropriate structure crucial, according to Municipal Commissioner Saurabh Rao.

Given that Thane has never witnessed a project of this scale, TMC is carefully considering the planning, management, and maintenance aspects before moving forward. The EOI process aims to gauge developer interest and their proposed role in executing the project.

Commissioner Rao reviewed the project's blueprint on Thursday, which is being developed under the vision of MP Shrikant Shinde. Additionally, the meeting covered progress on other major civic projects, including the Kolset-Balkum Town Park, the redevelopment of Yashwant Rama Salvi swimming pool in Kalwa, and a new theatre in Kharegaon. Senior civic officials, including City Engineer Prashant Sonagra and Deputy Commissioner Shankar Patole, attended the review.

Experts have suggested two financial models for the convention centre: a public-private partnership (PPP) or direct developer-led construction. TMC aims to strike a balance between financial viability for developers and maximum benefit for the civic body.

Meanwhile, the ₹2,600 crore Kolset-Balkum Town Park project, which will feature a science centre, aquarium, fisheries heritage centre, planetarium, and commercial spaces, was also discussed. Commissioner Rao directed officials to finalize its financial feasibility and secure necessary approvals from the state government.

The redevelopment of Kalwa’s swimming pool is progressing, with hazardous structures already being demolished. The architectural plans are in progress and will be presented on Monday. Rao also instructed officials to expedite the reservation change process for necessary approvals.

Similarly, for the Kharegaon theatre project, land acquisition is underway, with 50% of the required space already in TMC’s possession. The remaining land is being secured through development plan reservations, with legal approvals sought. The theatre’s design plans are expected next week.

 

Tags: Thane Municipal CommissionerThaneGhodbunder RoadCoastal Road
Open in App

Related Stories

ThaneThane Accident: 27-Year-Old Woman Loses Life in Ghodbunder Road Crash After Truck-Bike Collision

ThaneThane: Teen Dies After Falling Into Open Drain in Dombivli During Navratri Bhandara

ThaneThane Rains: Man Missing After Being Swept Away in Ulhas River During Heavy Downpour

ThaneThane: 22-Year-Old Dies After Falling from 11th Floor in Dombivli; Horrific Video Surfaces

MaharashtraMHADA Konkan Board Extends Deadline for E-Auction of 71 Shops in Virar Boliinj and Chitlasar Manpada

Thane Realted Stories

MumbaiMumbai Crime Branch Arrests Accused in Malad Firing Incident, Pistol Seized

MumbaiMumbai: Malvani Police Crack Woman’s Murder Case, Accused Arrested from Uttar Pradesh

MumbaiMumbai: Chunabhatti Police Bust Mobile Theft Gang, Eight Arrested; Links Traced to Bangladesh

MumbaiMumbai: 70-Year-Old Man Attempts Self-Immolation Outside Mantralaya Over Noise Pollution

MumbaiMumbai: Ex-CISF Constable Cheats Job Seekers of Rs 2.88 Crore by Promising Govt Jobs