City
Epaper

Cidco Bus Stand-Harsul road in sorry state

By Lokmat English Desk | Updated: October 3, 2021 23:20 IST

Aurangabad, Oct 3:The road from Cidco Bus Stand to Harsul, which was used mostly to bring VIPs in ...

Open in App

Aurangabad, Oct 3:

The road from Cidco Bus Stand to Harsul, which was used mostly to bring VIPs in the city, in a sorry state because of potholes.

The public works department (PWD), which is responsible for the maintenance and repair of the road, refused to do it. It requires Rs 5.5 crore to restore the road’s former glory.

Once upon a time, it was maintained as a VIP road in the city. But now, the caravan of most of the ministers pass through Jalna Road to Mahavir Chowk, from Town Hall to the Divisional Commissionerate, so, the importance of this road has diminished.

The road is repair temporarily if important people pass through it. The road is 6 km long, with potholes after every 100 meters. This road leads to the world-famous Ajanta Caves. This road starts with a pothole. It is affecting tourism also. It was repaired in 2013 last time. A private agency completed the work at Rs 4 crore. However, Rs

A contractor responsible has the responsibility of repair for five years.

PWD Executive Engineer S S Bhagat said that the potholes on this road were filled up in the meantime. “Tarring of the road will be done after the monsoon season. The cost of road repair is from Rs 2 crore to 2.5 crores,” he said.

Tags: CidcoAjanta Caves
Open in App

Related Stories

Navi MumbaiNavi Mumbai: CIDCO Razes Massive Illegal Constructions in Belondakhar Logistic Park

Navi MumbaiCIDCO Homes in Navi Mumbai: 4,508 Ready-to-Move Flats Available in Dronagiri, Kalamboli, Kharghar and Ghansoli

Navi MumbaiNavi Mumbai Traffic Update: Authorities Issue 12-Month Traffic Plan for CIDCO’s Tunnel Work on Sion–Panvel Highway

MaharashtraMaharashtra Cabinet Clears 'Iconic Cities Policy' for Land Owned by CIDCO, Other Agencies

Navi MumbaiNavi Mumbai Pathway Connecting Railway Station Closed by CIDCO for Construction Work in Kharkopar

Aurangabad Realted Stories

AurangabadArrival & departure of 'Sachkhand Express delayed

AurangabadBJP-Shinde Sena blames each other for delay in resolving seat sharing issue

Aurangabad2 create ruckus with swords & attempt to burn vehicles

AurangabadClerk demanded bribe to reduce professional tax from Rs 3 lakh to Rs 20,000

AurangabadTaps run dry as city water supply disrupted for 11 hours