City
Epaper

Power disruption hits water supply of 35 wards

By Lokmat English Desk | Updated: December 3, 2021 22:30 IST

Aurangabad, Dec 3:The water supply of many areas from various Cidco and Hudco sectors have been delayed due ...

Open in App

Aurangabad, Dec 3:

The water supply of many areas from various Cidco and Hudco sectors have been delayed due to disruption in power supply by MSEDCL to undertake its routine repair and maintenance works today. As a result, the Aurangabad Municipal Corporation (AMC), was unable to supply water to many areas of Cidco-Hudco (around 35 wards) during the morning hours. The supply got delayed by 5-7 hours, said the AMC acting executive engineer Kiran Dhande.

The power supply of areas where the elevated storage reservoirs (ESRs) of Cidco N-5 and N-7 sectors are situated got stopped on Friday at 10 am and revived at 3 pm. Hence the water supply to the localities dependent on these ESRs could not be made in the morning. We tried to restore the situation by supplying water to areas scheduled to receive water in taps during the afternoon, said Dhande.

Meanwhile, the power supply of Jubilee Park ESR was also closed for two hours. Accordingly, the water supply to the surrounding localities got delayed by a couple of hours. Hence, localities from 35 wards, dependent upon Cidco N-5, N-7 and Jubilee Park ESRs were affected and were supplied water during late evening hours, it is learnt.

Tags: CidcoMSEDCLKiran dhandeAurangabad municipal corporationAMCJubilee Park ESR
Open in App

Related Stories

Navi MumbaiNavi Mumbai: CIDCO Razes Massive Illegal Constructions in Belondakhar Logistic Park

Navi MumbaiCIDCO Homes in Navi Mumbai: 4,508 Ready-to-Move Flats Available in Dronagiri, Kalamboli, Kharghar and Ghansoli

Navi MumbaiNavi Mumbai Traffic Update: Authorities Issue 12-Month Traffic Plan for CIDCO’s Tunnel Work on Sion–Panvel Highway

MaharashtraMaharashtra Cabinet Clears 'Iconic Cities Policy' for Land Owned by CIDCO, Other Agencies

Navi MumbaiNavi Mumbai Pathway Connecting Railway Station Closed by CIDCO for Construction Work in Kharkopar

Aurangabad Realted Stories

AurangabadArrival & departure of 'Sachkhand Express delayed

AurangabadBJP-Shinde Sena blames each other for delay in resolving seat sharing issue

Aurangabad2 create ruckus with swords & attempt to burn vehicles

AurangabadClerk demanded bribe to reduce professional tax from Rs 3 lakh to Rs 20,000

AurangabadTaps run dry as city water supply disrupted for 11 hours