City
Epaper

Maruti's Manesar railway siding to cut 65,000 truck trips annually

By ANI | Updated: June 17, 2025 18:58 IST

By Shailesh YadavManesar (Haryana) [India], June 17 : Maruti Suzuki's new railway siding at its Manesar plant will ...

Open in App

By Shailesh Yadav

Manesar (Haryana) [India], June 17 : Maruti Suzuki's new railway siding at its Manesar plant will eliminate approximately 65,000 truck trips annually, translating to 232 fewer truck journeys per day based on 280 working days, Senior Executive Director, Corporate Affairs, Rahul Bharti announced on Tuesday.

Speaking toat the Manesar facility, Bharti highlighted that the railway terminal will dispatch seven popular models including Celerio, WagonR, SPresso, Dzire, Brezza, Ertiga and XL6, while export vehicles will be transported to Pipavav and Mundra ports through the new facility.

The Manesar railway siding represents India's largest automobile GatiShakti Multi-Modal Cargo Terminal, capable of dispatching 450,000 vehicles annually at full capacity. Spread across 46 acres within the Manesar facility, the terminal features a fully electrified 8.2-kilometer corridor with four full-length tracks plus one engine escape track, a two-floor station building, and comprehensive support infrastructure.

The project, executed through a joint venture with Haryana Orbital Rail Corporation Ltd (HORCL) at a total cost of Rs 1,170.91 crore, marks the company's second such facility following the Gujarat plant's inaugural railway siding.

Maruti Suzuki's green logistics transformation has been remarkable since FY 2014-15, with railway dispatches growing nearly eight-fold from 5 per cent to 24.3 per cent of total vehicle dispatches in FY 2024-25.

The company dispatched a record 5.18 lakh vehicles through railways last fiscal year, contributing to a cumulative 25 lakh vehicles transported via rail since the initiative began.

Currently operating over 40 flexi-deck rakes with 300-vehicle capacity each, the automaker serves more than 600 cities across India through 21 distribution hubs.

The environmental impact of this logistics strategy is substantial, with the Manesar facility alone expected to avoid 175,000 tonnes of CO2 equivalent emissions and save 60 million litres of fuel annually at full capacity.

As Maruti Suzuki prepares to scale production to 4 million units by FY 2030-31, the company plans to increase railway usage to approximately 35 per cent of total dispatches over the next five to six years, reinforcing its commitment to sustainable transportation and reduced carbon footprint in the automotive sector.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

EntertainmentElton John celebrates 20th Wedding Anniversary with 'incredible husband' David Furnish

AurangabadInterviews for candidates by Uddhav Sena Today

AurangabadBurglars break into businessman’s flat, steal jewellery

Other SportsNew Zealand's Suzie Bates ruled out for three months

InternationalMeditation key to tackling global mental health crisis: Sri Sri Ravi Shankar

Business Realted Stories

BusinessS. Korean trade minister voices concern over new Canadian steel import policy

BusinessNo changes in existing rules for short selling: SEBI

BusinessPetroleum and Natural Gas Rules 2025 to bring paradigm shift in oil & gas sector: Hardeep Puri

Business‘Greatest gift for Assam’: Leaders and commoners praise PM Modi over Namrup urea plant

BusinessTripura Gramin Bank leads in implementing PM Modi's flagship schemes with last-mile focus: Officials