City
Epaper

Maruti's Manesar railway siding to cut 65,000 truck trips annually

By ANI | Updated: June 17, 2025 18:58 IST

By Shailesh YadavManesar (Haryana) [India], June 17 : Maruti Suzuki's new railway siding at its Manesar plant will ...

Open in App

By Shailesh Yadav

Manesar (Haryana) [India], June 17 : Maruti Suzuki's new railway siding at its Manesar plant will eliminate approximately 65,000 truck trips annually, translating to 232 fewer truck journeys per day based on 280 working days, Senior Executive Director, Corporate Affairs, Rahul Bharti announced on Tuesday.

Speaking toat the Manesar facility, Bharti highlighted that the railway terminal will dispatch seven popular models including Celerio, WagonR, SPresso, Dzire, Brezza, Ertiga and XL6, while export vehicles will be transported to Pipavav and Mundra ports through the new facility.

The Manesar railway siding represents India's largest automobile GatiShakti Multi-Modal Cargo Terminal, capable of dispatching 450,000 vehicles annually at full capacity. Spread across 46 acres within the Manesar facility, the terminal features a fully electrified 8.2-kilometer corridor with four full-length tracks plus one engine escape track, a two-floor station building, and comprehensive support infrastructure.

The project, executed through a joint venture with Haryana Orbital Rail Corporation Ltd (HORCL) at a total cost of Rs 1,170.91 crore, marks the company's second such facility following the Gujarat plant's inaugural railway siding.

Maruti Suzuki's green logistics transformation has been remarkable since FY 2014-15, with railway dispatches growing nearly eight-fold from 5 per cent to 24.3 per cent of total vehicle dispatches in FY 2024-25.

The company dispatched a record 5.18 lakh vehicles through railways last fiscal year, contributing to a cumulative 25 lakh vehicles transported via rail since the initiative began.

Currently operating over 40 flexi-deck rakes with 300-vehicle capacity each, the automaker serves more than 600 cities across India through 21 distribution hubs.

The environmental impact of this logistics strategy is substantial, with the Manesar facility alone expected to avoid 175,000 tonnes of CO2 equivalent emissions and save 60 million litres of fuel annually at full capacity.

As Maruti Suzuki prepares to scale production to 4 million units by FY 2030-31, the company plans to increase railway usage to approximately 35 per cent of total dispatches over the next five to six years, reinforcing its commitment to sustainable transportation and reduced carbon footprint in the automotive sector.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

PunePune Accident: Death Toll Rises to 10; Maharashtra CM Announces Rs 4 Lakh Ex-Gratia for Victims’ Families

NationalPIB debunks deepfake video falsely attributing fighter jet losses to Air Chief Marshal Amar Preet Singh

NationalAndhra Pradesh liquor scam: SIT files additional charge sheet

CricketCricket Australia reports South Asian cricket participation surpasses target two years early

NationalTDP MPs meet PM Modi, HM Shah; discuss Andhra Pradesh-related issues

Business Realted Stories

BusinessAadhaar face authentication doubles to 200 crore transactions in just 6 months

BusinessLok Sabha clears new Income Tax Bill 2025: All you need to know about key changes

BusinessTotal area sown under kharif crops in India crosses 995.6 lakh hectares

BusinessBrigade Hotel Ventures' Q1 profit declines 45 pc sequentially, revenue down 7 pc

BusinessBengaluru Tech Summit 2025 must send out big message to world: Shivakumar