City
Epaper

Dahisar River Revival Stalled by Slum Issue

By Lokmat English Desk | Updated: January 12, 2024 09:34 IST

The revival of the Dahisar River, a tributary flowing from Sanjay Gandhi National Park to Manori Creek, has stalled ...

Open in App

The revival of the Dahisar River, a tributary flowing from Sanjay Gandhi National Park to Manori Creek, has stalled for two years due to the presence of 180 slums along its banks. The 24 crore rupee project, launched in October 2020, was expected to be completed by October 2023. However, the rehabilitation of over 100 slums in Ambawadi, Ektanagar, and Sanjaynagar in Dahisar has not yet been resolved, slowing down the project. So far, 55% of the project has been completed. Due to the discharge of sewage from Bhate slums, the river has become severely polluted. The water of the river has turned completely black. Preventing further contamination requires stopping sewage from entering the river, a key goal of the revival project. 

The Dahisar River flows through a 12-kilometer stretch with significant tree cover along its banks. After the Brihanmumbai Stormwater Disposal System (BRIMSTOWADproject, the riverbed was widened. After the revival, there are plans to beautify the riverside area. Two sewage treatment plants have been built along the river; however, it is necessary to collect and transport the sewage from slums through sewer lines and deposit it in the STPs.

"It is necessary to clear the area of six meters along the river bank. For this, some buildings will have to be removed. Some slums will be rehabilitated in the Zhopu scheme. If that happens, the project will gain momentum," said, Nayanish Vengurlekar, an Assistant Commissioner, R North. 

Magsaysay award winner and hydrologist Rajendra Singh also tried to revive the river a few years ago. He tried to maintain rivers Mithi, Oshiwara, and Poisar along with Dahisar. Slum rehabilitation remains the critical hurdle delaying the project's progress. Finding a solution to this issue is essential for the project's completion.

The project encompasses activities like widening the riverbed, strengthening the banks, installing sewage treatment plants, and planting trees along the riverbanks. Upon completion, the Dahisar River will be diverted from the Nala River to flow directly into the Manori Creek.

 

Tags: Dahisar river revival projectDahisarMumbai NewsMaharashtra News
Open in App

Related Stories

PunePune News: School Bus Loses Control, Hits Electric Pole; Several Students Injured

MaharashtraSunetra Pawar Reaches Out to Uddhav Thackeray for Support Ahead of Baramati Bypoll

MaharashtraIllegal Cattle Slaughter Racket Exposed: 21 Animals and 510kg Beef Recovered

NashikNashik Shocker: Man Arrested After Allegations of Sexual Exploitation, 121 Clips Recovered

MumbaiMumbai: Customer Bites Vendor’s Fingers During Bill Dispute Over Samosa in Malad

Maharashtra Realted Stories

PunePune Horror: Man Arrested for Alleged Sexual Assault on 7-Year-Old Girl in Moshi

PunePune Crime: Auto Driver Assaulted by Four in Katraj, Hit on Head with Cement Block

MumbaiMumbai Local Train Mega Block on April 5, 2026: No Day Block on Western Line This Sunday; Check Details of Central and Harbour Lines

MumbaiMalad: Man Allegedly Bites Samosa Vendor’s Fingers Over Food Bill; Accused Arrested

MaharashtraKonkan Railway Block: Janshatabdi, Tejas, Konkan Kanya, Mandovi Express to Run Only Up to Panvel; Check Details