City
Epaper

Malvan Bandh: Protest Erupt Over Collapse of Chhatrapati Shivaji Maharaj Statue in Rajkot Fort

By Lokmat English Desk | Updated: August 28, 2024 16:16 IST

Malvan Bandh: Mahavikas Aghadi and Shiv Sainiks have called for a bandh today following the collapse of the Chhatrapati Shivaji Maharaj statue in Malvan Rajkot on Monday evening. As a result, a strict shutdown was observed in Malvan today August 28, 2024, with all businesses closed.

Open in App

Mahavikas Aghadi and Shiv Sainiks have called for a Malvan bandh today following the collapse of the Chhatrapati Shivaji Maharaj statue in Malvan Rajkot on Monday evening. As a result, a strict shutdown was observed in Malvan today August 28, 2024, with all businesses closed. A large police presence was deployed at the start of the march.

Shiv Sainiks gathered near the Shiv Sena branch, chanting slogans against the state government in protest of the statue's collapse, which has sparked widespread anger in Maharashtra. Opposition parties have criticized the government over the incident. On Navy Day, the Indian Navy had planned to unveil a full-length statue of Chhatrapati Shivaji Maharaj, who is considered the father of Indian armor. This 35-foot statue was inaugurated by Prime Minister Narendra Modi on December 4, 2023. Constructed by the Indian Navy, the statue's pedestal was built by the Maharashtra Public Works Department (PWD).

Also Read: Shivaji Maharaj Statue Collapse: Shiv Sena UBT and Narayan Rane Supporters Clash at Rajkot Fort in Malvan During Aditya Thackeray's Visit

Following the collapse, Maharashtra Minister Deepak Kesarkar mentioned that there is public demand for a 100-foot statue to be built in its place. He intends to discuss this proposal with the Chief Minister and Deputy CM and prepare estimates. Opposition parties have alleged corruption in the statue's construction, with NCP leader Supriya Sule claiming the contract was awarded to a contractor from Thane district, CM Eknath Shinde's home area.

While the exact cost of the initial statue has not been disclosed, the situation indicates a significant undertaking by the state government and Navy, amidst allegations of corruption in the contract award. There are now plans to construct a larger 100-foot statue at the site.

Tags: MalvanMaharashtra NewsChhatrapati Shivaji Maharaj StatueSindhudurg
Open in App

Related Stories

MaharashtraChhatrapati Sambhajinagar: ACB Catches School Headmistress Red-Handed in Bribery Case

PunePune Water Cut: 15% Supply Reduction Begins From April 9 Amid El Niño Concerns

MumbaiMumbai Car Loan Scam: Fake Recovery Agents Chase Man for Alleged EMI Dues of Vehicle on Eastern Express Highway

MaharashtraMaharashtra: Beed Tehsildar Rakesh Gidde Dies in Tragic Car Crash Near Renapur

MumbaiMetro 9 Draws Crowds While Line 2B Runs Nearly Empty on Opening Day

Maharashtra Realted Stories

MumbaiMumbai Metro Line 3 Introduces Discounted Passes for Students and Tourists; Check Rates

PunePune Shocker: Man Beats Hotel Manager for Asking to Settle Food Bill, Case Registered

MaharashtraDharashiv: Gas Agency Distributor Attempts Suicide During Online Meeting Over Financial Stress

MaharashtraSunetra Pawar Set to Win Baramati Assembly By-Poll As Congress Withdraws Candidate

MaharashtraParth Pawar Takes Oath As Rajya Sabha MP, Wears Father Ajit Pawar’s Pink Jacket