City
Epaper

MHADA's Mumbai Pre-Monsoon Survey Flags 20 High-Risk Buildings, Transit Arrangements Underway

By Lokmat English Desk | Updated: May 30, 2024 09:00 IST

Mumbai: MHADA's Mumbai Building Repairs and Reconstruction Board (MBRRB) has completed a routine pre-monsoon survey of old and dilapidated ...

Open in App

Mumbai: MHADA's Mumbai Building Repairs and Reconstruction Board (MBRRB) has completed a routine pre-monsoon survey of old and dilapidated buildings on the Mumbai city island and found 20 buildings to be at high risk this year. The 20 buildings include four that were declared high-risk last year.

Also Read | Mumbai Local Train Update: CR Cancels 930 Locals from May 31 to June 2 For Platform Works at Thane and CSMT

There are a total of 711 residents/tenants, including 494 residential and 217 non-residential, in high-risk cessed buildings. Thirty-six residential tenants/residents have made alternative accommodation arrangements for their own. So far, 46 residents have been shifted to transit camps. Tenants/residents of the remaining buildings have been instructed to vacate the houses. It has also been planned that 412 residential tenants/residents will have to be accommodated in the transit camp. The process of making alternative arrangements for them in the transit camps is in progress.

20 List of high-risk buildings1) Building No. 4-4A, Naoroji Hill Road No. 1, Jolly Chamber - from last year's list2) Building No. 57 Nizam Street  3) Building No. 67, Masjid Street4) Building No. 52-58, Babu Genu Road5) Building No. 7 Khanderao Wadi/ 204-208, Kalbadevi Road6) Building No. 52 -52A, 2nd Deccan Cross Road7) Building No. 125-127A, Jamna Niwas, Khadilkar Road, Girgaon 8) Building No. 314B, Brahmand Co-op Housing Society, V.P. Road, Girgaon9. Building No. 418-426, S.V.P. Road, (124-134A) Golecha House10) Building No. 83 - 87 Raote Building, JSS Road, Girgaon11. Building No. 213-215 Dr. D.B. Marg12. Building No. 38-40 Slater Road13) 9d Chunnam Lane14) 44 E Naushir Bharucha Marg15) 1 Khetwadi 12th Lane16) 31C and 33A, R Rangnekar Marg and 19 Purandare Marg, Girgaon Chowpatty (from last year's list)17) Building No. 104-106 (Meghji Building, A, B and C Wing, Shivdas Chapsi Marg)  18) Building No. 55-59-61-63-65 Sophia Zubair Road19) Building Nos. 44-48, 33-37, and 9-12 Kamathipura 11th and 12th Street, Deol Building20) Final Plot No. 721 and 724 TPS - 3 Division, Building No. 40B and 428, Sub-Tax No. G. North 50-95 (1) and C North-5103 Atmaram Building and Penkar Chawl (from last year's list)  

Tags: MhadamumbaiGirgaonKamathipurabuildings
Open in App

Related Stories

CricketVijay Hazare Trophy 2025–26: Sarfaraz Khan’s 150 and Mushir’s Half-Century Power Mumbai to 444/8

MumbaiMumbai Metro One Adds Additional Train Services Between Versova and Ghatkopar on New Year Eve

MumbaiLast Sunrise of 2025 Video: Mumbaikars Witness Golden Dawn at Gateway of India

MumbaiMumbai Faces Poor Air Quality; Residents Urged to Limit Outdoor Exposure

MaharashtraWork with Sena (UBT) to Save Mumbai: Raj Thackeray Asks Party Workers to Keep Differences Aside

Mumbai Realted Stories

MumbaiMumbai: Bomb Threat Message Found Written on Dusty Car Near Sanjay Raut’s Bhandup Residence; Police Launch Probe

MaharashtraNIA Chief Sadanand Date Appointed as New Maharashtra DGP, to Assume Charge on January 3

MumbaiMumbai Drug Crackdown 2025: Narcotics Worth Over Rs 800 Crore Seized, Major Syndicates Crushed, Says DCP ANC Navnath Dhavale

MaharashtraMaharashtra: Motorcyclist Killed in Rear-End Collision With Truck Near Kankavli While Overtaking

MaharashtraMaharashtra Municipal Election 2026: BJP Wins Unopposed in Kalyan-Dombivli, Panvel, and Dhule