City
Epaper

Mumbai Coastal Road: 12 Lakh Vehicles Travelled on Southern Route So Far, 80,000 on Northern Route

By Lokmat English Desk | Updated: June 18, 2024 11:34 IST

Mumbai: The Coastal Road project has given impetus to Mumbaikars' journey with as many as 12,28,279 vehicles having travelled ...

Open in App

Mumbai:The Coastal Road project has given impetus to Mumbaikars' journey with as many as 12,28,279 vehicles having travelled on the southern route so far, while more than 80,000 vehicles have been plying on the recently opened northern line in four days. Passengers travelling on one lane between Worli and Marine Drive are now saving time and fuel with the opening of the line from Marine Drive to Worli. Mumbaikars are opting for the coastal road as it takes eight to 10 minutes for a 40-minute journey. After the completion of the Bandra-Worli Sea Link connection, the journey from Marine Drive to Bandra can be done in 12 minutes.

Also Read | Akhand Konkan Railway Pravasi Seva Samiti Calls for Additional Ganapati Special Trains and Extra Stops for Ganesh Chaturthi Travel Rush

The South line of the Dharamveer Swarajya Rakshak Chhatrapati Sambhaji Maharaj Mumbai Coastal Road Project from Worli to Marine Drive was opened in March, while the Northern line started on June 11. Mumbaikars were very curious about this much-awaited route. On the first day, 15,836 vehicles travelled on the South Channel from 8 am to 8 pm, while 20,000 vehicles passed through the North Channel on the first day.

Coastal Road- Marine Drive to Worli-South Channel 

Number of vehicles:

March 2024- 2,63,610

April 2024 - 436,150

May 2024- 5,28,519

June 11 -20,450

89.67 per cent of the work on the coastal road project has been completed and the work of installing bow string arch girders for the Bandra-Worli Sea Link connection is in progress by July. It will be possible to travel to Bandra Worli Sea-Lick by the end of July. Once the Bandra-Worli Sea Link connection is completed, the journey from Marine Drive to Bandra can be done in just 12 minutes.

Tags: Mumbai Coastal RoadCoastal Road projectWorliBandra-Worli sea linkMarine DriveBandra
Open in App

Related Stories

MumbaiMumbai Traffic Update: Heavy Rains Cause 30-Minute Delays on Eastern Freeway and WEH

MumbaiMumbai Rains: High Tides Reported Under Bandra-Worli Sea Link Bridge (Watch Video)

MumbaiMumbai Road Accident: 60-Year-Old Woman Dead After Being Run Over by Mercedes In Bandra

MumbaiMumbai’s Transport Gets Major Boost as Maharashtra Govt Unveils Five Key Infrastructure Projects on Independence Day Eve

MumbaiWorli BDD Chawl Redevelopment Live Streaming: Watch Online Telecast As Mumbai MHADA Hands Over Keys of 556 Flats to Residents

Mumbai Realted Stories

MumbaiMumbai Rains: CSMIA Issues Flight Advisory as Heavy Downpour Triggers Delays and Diversions

MumbaiMumbai: Iconic Sword of Raghuji Bhonsle Arrives from London; Bike Rally Cancelled Due to Rains, Grand Inauguration Tonight

MumbaiMumbai Local Train Update: Harbour Line Services Delayed Due to Waterlogging Between These Stations Amid Heavy Rains

MumbaiSchool Holiday in Mumbai Today: BMC Declares Closure of Schools and Colleges as City Under Red Alert Amid Heavy Rainfall

MumbaiMumbai Rains: School Bus Stuck in Waterlogging in Matunga, Police Rescued (Watch Video)