City
Epaper

Mumbai Metro Line 7A: Final Tunnel Breakthrough Achieved, Paving Way for Seamless Airport Link by 2026

By Lokmat English Desk | Updated: July 16, 2025 13:15 IST

The construction work of the second and final 1.65 km-long tunnel on the Mumbai Metro Line 7A, which will ...

Open in App

The construction work of the second and final 1.65 km-long tunnel on the Mumbai Metro Line 7A, which will connect Andheri (East) and Chhatrapati Shivaji Maharaj International Airport (CSMIA), has been completed. With this, the metro line 7A has achieved a big milestone. The tunnel boring machine (TBM) T-60 made the breakthrough on July 14, 2025, which was a major step forward for this vital infrastructure project. The TBM drive started on November 4, 2023, and tunnelling started on September 1, 2023, under the direction of the Mumbai Metropolitan Region Development Authority (MMRDA). 1,178 rings, each 1.4 meters long and composed of six segments, were used to construct the tunnel, which has a completed diameter of 5.6 meters. The tunnel is between 12 and 28 meters deep. There is a 2.5 km subterranean portion of the 3.4 km Metro Line 7A. It is intended as a partially elevated and partially underground alignment, and it has two underground stations: Airport Colony and T2 Airport.

When this metro line becomes operational, it will provide a seamless interchange at the CSMIA station with Metro Line 3. This line will ensure that there is better connectivity for its commuters.

Also Read: 'Chaddi Baniyan' Protest at Maharashtra Assembly: Opposition Stages Agitation Against Sena MLA for Punching and Slapping Canteen Staff (Watch Video)

A senior official associated with this project said that the commuters from Mira-Bhayander could reach BKC with just one interchange at the airport station.

The project is expected to be ready by 2026. As of now the 61% of the construction work is completed. Many engineering challenges are tackled by the authorities, which include construction under the Sahar Elevated Road, an overpass above Metro Line 3, diversion of a major sewer line, and crossing an underground water pipeline. The Metro Line 7A will integrate with Metro Lines 2A, 7, 9, and 3. This integration will strengthen Mumbai’s metro network and ease travel across the city.

Tags: Mumbai MetroMumbai Metro Line 7Mumbai metro lineMumbai NewsMaharashtra News
Open in App

Related Stories

MumbaiMumbai: Schoolgirls Seen Climbing Down Shut FOB, Viral Video Sparks Outrage Over Civic Negligence (Watch)

ThaneThane Water Cut: Pipeline Damage Near Kalyan Phata Prompts 12-Hour Zonal Supply System Till December 15

MaharashtraMaharashtra Assembly: Dada Bhuse Criticises Finance Department's Strictures on Science Scheme

MumbaiMumbai: Builder and His Son Arrested for Cheating Buyers of Rs 1.87 Crore in Flat Sale Fraud

MumbaiMumbai Fraud: Woman Duped of ₹1.17 Crore in High-Profile Loan Fraud; FIR Lodged Against Six

Mumbai Realted Stories

MumbaiMumbai Local Train Commotion: Viral Clip Captures Couple Harassing Disabled Commuters, Anger Erupts Online (Watch)

MaharashtraVirar Building Collapse: VVCMC Assistant Commissioner Gilson Gonsalves Suspended From Service Over Gross Negligence

PunePune: 11-Year-Old Found Dead on Tracks Near Hadapsar After Leaving Home in Anger, Says Police

MumbaiDog Attack in Mumbai: School Security Guard Injured After Stray Dog Bites His Shoulder in Goregaon; Dramatic CCTV Footage Goes Viral

MaharashtraMHADA Lottery Result 2025: Draw for 4,168 Flats in Pune, Pimpri and Other Districts Likely on December 16 or 17