City
Epaper

Mumbai Metro Line 9: MMRDA Imposes Rs 5 Lakh Penalty on Contractor J Kumar After Mira Road Video Goes Viral

By Lokmat Times Desk | Updated: November 1, 2025 13:45 IST

Mumbai Metropolitan Region Development Authority (MMRDA), the body for the construction of Mumbai Metro lines, has imposed a hefty ...

Open in App

Mumbai Metropolitan Region Development Authority (MMRDA), the body for the construction of Mumbai Metro lines, has imposed a hefty penalty on contractor J.Kumar Infraprojects for negligence and failing to follow safety norms. A video of under under-construction Mumbai Metro Line 9 near the Mira-Bhayandar Metro station has gone viral, where workers are performing welding work without any safety where sparks falling on the busy road. 

Reacting to the viral video, MMRDA took action against the contractor and imposed a Rs 5 lakh penalty on J Kumar Infra after it was found guilty of negligence while welding during work on Metro Line 9. J Kumar is responsible for the construction of tracks, stations, and other infrastructure under the MMRDA’s supervision.

The incident occurred on October 30 near the Sarvodaya Complex on Mira Road. During welding work, large sparks of fire were seen falling onto the road below, where pedestrians and vehicles were passing. At one point, a large ball of fire fell onto a mini tempo traveller and then onto the road.

Also Read | Mumbai Traffic Update: Police Issue Advisory for 'Satyacha Morcha' Rally Today; Check Restrictions and Diversions.

The video of the incident went viral on social media, drawing sharp criticism over the lack of safety measures by the MMRDA and the contractor. Taking cognisance of the matter, the MMRDA on Friday announced a penalty of Rs 5 lakh against J Kumar Infra for failing to follow safety protocols.

Earlier, a similar incident had occurred when a heavy iron jack fell from a height during Metro work. Following public outrage, the MMRDA had then imposed a fine of Rs 10 lakh on the same contractor.

Tags: Mumbai Metro Line 9Mumbai MetroMmrdamumbaiMira bhayandar
Open in App

Related Stories

MumbaiMumbai: Fire Breaks Out at Terminal 1 of Chhatrapati Shivaji International Airport; No Injuries Reported (Watch Video)

MumbaiMumbai Metro Line 3 Introduces Discounted Passes for Students and Tourists; Check Rates

MumbaiMetro 9 Draws Crowds While Line 2B Runs Nearly Empty on Opening Day

MumbaiMumbai Metro Line 9 Phase 1 Opens: Check Fares and Timings

MumbaiMumbai Metro Line 9 Phase 1 Flagged Off by CM Devendra Fadnavis at Kashigaon (Watch Video)

Mumbai Realted Stories

MumbaiDaylight Heist in Kurla: Jeweller Duped of ₹15 Lakh by Fake Cops in Filmy-Style Robbery

MumbaiGujarat Drug Trafficker Busted in Mumbai, Multi-Crore Synthetic Drug Racket Exposed

MumbaiLadki Bahin Yojana: Stop Scheme If No Funds for Pension, Says Bombay HC

MumbaiMumbai Local Train News: City To Get India’s First Non-AC ‘Closed-Door’ Local

MumbaiMumbai Songwriter Duped of ₹3.25 Lakh on Pretext of Work with Singer Kailash Kher