City
Epaper

Mumbai Traffic Advisory: Bhandup-Sonapur Junction to Remain Closed on November 1 & 2 for Metro Line 4 Work – Check Alternative Routes Here

By Lokmat Times Desk | Updated: October 30, 2025 13:33 IST

Residents of Bhandup, Mulund, and Kanjurmarg are set to experience significant traffic congestion, as vehicular movement at the Bhandup-Sonapur ...

Open in App

Residents of Bhandup, Mulund, and Kanjurmarg are set to experience significant traffic congestion, as vehicular movement at the Bhandup-Sonapur Junction will be completely halted for two days—November 1 and 2. According to a Mid-Day report citing the Mumbai Traffic Police, the closure has been announced to facilitate the installation of a massive 56-metre-long steel span for Metro Line 4. During this period, only emergency vehicles will be allowed to pass. The shutdown is necessary because large cranes, multi-axle trailers, and heavy machinery will be deployed at the site for the operation.

 

The Mumbai Traffic Police stated that the closure will take effect from 10 pm on November 1 to 10 am on November 2, and again from 10 pm on November 2 until 7 am on November 3. If the work remains unfinished, the same route may face closures next weekend—on November 9 and 10. Additionally, traffic authorities have informed that one lane of the busy LBS Road will also remain closed for nearly two months, from November 3 to December 31, to accommodate ongoing Metro Line 4 construction work in the area.

 

To manage the disruption, a series of traffic diversions have been announced. Vehicles traveling from Powai and JVLR towards Mulund via LBS Road will be rerouted through a 2.5-kilometre detour that reconnects to LBS Road at Mulund West. Similarly, commuters from Mulund West will be directed towards the Eastern Express Highway (EEH) and can continue their journey via JVLR. Motorists coming from Kanjurmarg and Bhandup West towards Mulund East and West via LBS Road will also face restrictions near Kalpana Chawla/Madhuban Garden, close to Bhandup Police Station, where movement will be limited.

 

Metro Line 4, which spans 32.32 km from Wadala to Kasarvadavali, includes 30 stations and aims to enhance connectivity across Mumbai. Once operational, it will link with several key routes, including the Eastern Express Highway, Central Railway, and Monorail, along with ongoing projects like Metro Lines 2B, 5, and 6. The corridor will connect areas such as Bhakti Park, Vikhroli, Bhandup, Mulund, Thane, and Kasarvadavali, significantly reducing travel time for daily commuters and improving access between Mumbai and Thane.

Tags: Mumbai Traffic UpdateMumbai Traffic PoliceTraffic AdvisoryMumbai NewsMaharashtra NewsMumbai MetroMumbai metro line
Open in App

Related Stories

ThaneThane Water Cut: 24-Hour Water Supply Disruption on November 1–2; Check Timings and Affected Areas

MumbaiPowai Studio Hostage Crisis: Mumbai Police’s Swift Action Saves 19 Lives — Know the Exact Sequence

PunePune: Youth Loses Rs 8.5 Lakh to Fake HR Offering Part-Time Job, Another Duped in Prepaid Task Scam

MumbaiWho Is Rohit Arya? Man Who Held 15 to 20 Children Hostage in Powai and Threatened to Harm Them

MumbaiMumbai Children Held Hostage: All Kids Rescued Safely from Powai Studio, Confirms Police

Mumbai Realted Stories

MumbaiMumbai: Rohit Arya, Who Held 17 Children Hostage in Powai, Shot Dead by Police

MumbaiMumbai Resident’s 20-Minute Passport Renewal at Lower Parel PSK Amazes Internet

MumbaiMumbai: Upset Over Sister’s Relationship, Man Stabs Doctor at KEM Hospital

MumbaiMumbai: FIR Registered Against NCP (SP) MLA Rohit Pawar for Allegedly Creating Fake Aadhaar Card of Former US President Donald Trump

MumbaiSecurity Scare at Mumbai Police HQ: Trio Impersonates Union Minister’s Aides to Gatecrash Janata Darbar