City
Epaper

Mumbai Traffic Update: Elphinstone Bridge to Shut Down for Demolition and New Construction Work from April 25 – Details Inside

By vishal.singh | Updated: April 24, 2025 00:28 IST

The Elphinstone Bridge, connecting Parel and Prabhadevi in the east-west direction, will be closed permanently from Friday night for ...

Open in App

The Elphinstone Bridge, connecting Parel and Prabhadevi in the east-west direction, will be closed permanently from Friday night for demolition. In its place, a new Elphinstone Bridge and the Sewri-Warahi Elevated Connector Bridge will be constructed. Due to this redevelopment work, traffic will be diverted through alternate routes.

 

As per the order issued by DCP Traffic, Samadhan Pawar, these traffic diversions will come into effect from 9 PM on 25th April 2025.

 

Traffic  Diversion Routes:

 

For Eastbound Traffic (From West to East):

 

Vehicles heading towards Dadar East should use Tilak Bridge.

 

Vehicles going towards Tata and KEM Hospitals should use Currey Road Bridge between 3 PM to 11 PM.

 

Commuters coming from Prabhadevi and Worli areas should take the Chinchpokli Bridge.

 

 

For  Westbound Traffic  (FromEast to  West):

 

Vehicles travelling to Dadar West and Dadar Market should use Tilak Bridge.

 

For those heading towards Prabhadevi and Lower Parel, Currey Road Bridge will be open from 7 AM to 3 PM.

 

Vehicles going towards Coastal Road and Bandra-Worli Sea Link should use Chinchpokli Bridge.

 

 

Traffic Flow Update on Mahadev Palav Marg (Currey Road Railway Bridge):

 

One-way  traffic will be allowed  from7AM to 3PM.

 

Two-way traffic will be permitted from 11 PM to 7 AM.

 

 

No  Parking  Zones:

 

No parking rules will be strictly enforced on several key roads, including Senapati Bapat Marg and MM Joshi Marg, among others.

 

Emergency Measures:

 

To ensure medical aid during the traffic diversions, two ambulances will be stationed near Parel and Prabhadevi railway stations.

 

This directive has been officially issued on 23rd April 2025.

Tags: Mumbai NewsElphinstoneElphinstone BridgeMumbai trafficMumbai Traffic PoliceMumbai Traffic Update
Open in App

Related Stories

MumbaiMumbai Crime Branch Nabs 5 from Haryana with Illegal Firearms Near Cotton Green Station

MumbaiMumbai: 20-Year-Old Woman’s Phone Hacked After Taking Rs 2,000 Loan via Instagram Ad; AI-Morphed Obscene Images Sent to Relatives

MaharashtraMaratha Reservation Row: Manoj Jarange Patil to March to Mumbai on August 29, Says No Turning Back Until Quota Is Granted

MumbaiSunburn Festival 2025 Comes to Mumbai: Know Dates, Ticket Sales, Artist Line-Up & What to Expect

NationalAadhaar Photo Update: Still Have a Childhood Picture on Your Card? Here’s How to Change It

Mumbai Realted Stories

MaharashtraMaharashtra Weather Update: Moderate to Heavy Rain Likely from August 8; Check Full Forecast Here

MaharashtraMaharashtra MPSC Group C Prelims Result 2025 Declared at mpsc.gov.in; Here's How to Check and Download

MaharashtraKolhapur Bans Use of Laser Lights During Ganeshotsav 2025

MaharashtraMaharashtra: MBBS Admission Process Delayed Again; Amravati Medical College Prepares for Second Year

Navi MumbaiGaneshotsav 2025: Panvel Civic Body Demonstrates Online Permit System, Sets Strict Rules for Mandals on Noise and Security