City
Epaper

Mumbai Train Block from May 17 - June 1: Services to be Affected on Central Railway for 15 Days, Check Details

By Lokmat English Desk | Updated: May 17, 2024 10:00 IST

Mumbai: The Central Railway will have a 15-day long block due to platform expansion work at the Chhatrapati Shivaji ...

Open in App

Mumbai: The Central Railway will have a 15-day long block due to platform expansion work at the Chhatrapati Shivaji Maharaj Terminus. The work for expanding platforms 10 and 11 at the CSMT has reached its last stage. The timetable for local and mail-express trains has been changed accordingly. 

Also Read | Mumbai Hoarding Collapse: Report to be Submitted in 7 Days, Petrol Pump Under Scrutiny

The block will be in motion every night between 11 pm to 5 pm for 15 days between Friday, 17th May, and June 1st. The platform expansion has to finish interlocking works which will require a longer block. Next 15 days from Friday will have 12.14 am Kasara as the last local. During the block, local services between CSMT-Byculla will remain closed. The 9:43 Karjat-CSMT will be the last train going towards the Terminus. On the other hand, the 4 am Thane train to CSMT will be the first train to run after the block. The First CSMT-Karjat train will leave at 4:47 am. 

Trains Leaving from Dadar  CSMT-Amritsar Express, CSMT-Varanasi Mahanagari Express, CSMT-Madgaon Janashatabdi Express, CSMT-Chennai Superfast Mail, Madgaon Vande Bharat Express will leave from Dadar station instead of CSMT during the block. 

Trains Running till DadarAmritsar-CSMT Express, Lucknow-CSMT Pushpak Express, Bhuvaneshwar-Mumbai Konark Express, Madgaon-CSMT Tejas Express, Madgaon-CSMT Janashatabdi Express, Hyderabad-CSMT Hussain Sagar Express, Mangalore Junction-CSMT Express, Shirdi-CSMT Vande Bharat Express, Howrah-CSMT Superfasst, Hospete Junction-CSMT Express will have Dadar as their destination. 

Trains at Panvel The CSNT-Madgaon Konkan Kanya Express will leave from Panvel station whereas the Mandavi Express will run till Panvel. 

Tags: Train blockCentral RailwayCSMTDadarPanvelKarjat
Open in App

Related Stories

MaharashtraGanesh Chaturthi 2025: Good News! Central Railway Adds 44 More Ganpati Special Trains From Mumbai to Konkan

MumbaiMumbai Local Train Update: Services on Central Line Disrupted Between Vangani and Badlapur Due to Track Damage; Check Details

MaharashtraPanvel: 35-Year-Old Woman Dies by Suicide After Alleged Abuse by Alcoholic Husband; Case of Abetment Registered

MumbaiMumbai’s Iconic Tilak Bridge to Be Replaced - New Cable-Stayed Twin Set to Shine by 2028

MumbaiMumbai: Feeding Pigeons at Kabutarkhanas Can Cost Rs 500; 107 People Fined by BMC in First Half of July

Mumbai Realted Stories

MumbaiMumbai Local Train Commuter Attacks Railway Staff, Vandalises Office at Borivali Station After Being Caught Without Valid Ticket (VIDEO)

ThaneThane: Schoolgirl Attacked by Pack of Stray Dogs in Ulhasnagar; Video Surfaces

MumbaiMumbai Crime Branch Seizes Rs 25.5 Lakh Worth of Banned E-Cigarettes From Kurla Shops; One Arrested

MumbaiMumbai: After 177 Days, Devotees Bid Farewell to Charkop Cha Raja (Watch Video)

MumbaiMumbai Police File Case Against Three for Assault on 18-year-old Mentally Challenged Girl