City
Epaper

PM Modi Might Inaugurate BKC-Worli Stretch Of Mumbai Metro Line 3 On May 1

By Lokmat English Desk | Updated: April 30, 2025 13:21 IST

Mumbai Metro Line 3’s phase 2A and the Final stretch of the Samruddhi Expressway are two major infrastructure projects ...

Open in App

Mumbai Metro Line 3’s phase 2A and the Final stretch of the Samruddhi Expressway are two major infrastructure projects of Maharashtra. Prime Minister Narendra Modi will be on a tour to Mumbai on May 1 and may inaugurate these projects. Once these projects become operational, they will benefit many commuters on a regular basis. PM Modi will be visiting Mumbai mainly to inaugurate the World Audio and Visual Entertainment Summit (WAVES), being held at Jio World Centre, BKC. WAVES is a four-day event that aims to bring together all segments of the media and entertainment sector, reported PTI.

 

Mumbai Metro - Aqua Line Phase 2A:

The Commissioner of Metro Rail Safety (CMRS) inspected the Bandra Kurla Complex (BKC) to Aacharya Atre Chowk stretch of this metro line. This is an underground Metro stretch. The Mumbai Metro Rail Corporation Limited (MMRCL) is waiting for CRMS’s clearance certificate. Once the CRMS issues a certificate, this line will be open to the public. Phase 2 of Metro Line 3 passes through:

- Dharavi,

- Sheetla Devi Temple,

- Dadar,

- Siddhivinayak,

- Worli,

- Acharya Atre Chowk.

 

Also Read:  PM Modi to Inaugurate 4-Day WAVES Summit Hosted by Maharashtra Govt on May 1

Samruddhi Mahamarg:

The last section of the 701-kilometre Samruddhi Expressway will make the entire path available to traffic. The last 76 kilometres of the Samruddhi Expressway, which runs from Igatpuri to Amane, Thane, has been constructed by the Maharashtra State Road Development Corporation (MSRDC). The nation's most advanced highway will be completely accessible to cars once it is opened.

 

625 kilometres of the 701-kilometer Mumbai-Nagpur highway is now open. Now that this last section has been added, cars can travel from Mumbai to Nagpur in eight hours.

 

This segment of the expressway is quite an important one because it includes five tunnels spanning 11 km. India’s longest and widest tunnel spanning 7.8 km is built in this phase. With this stretch being operation journey from Igatpuri to Kasara will now just take 8 minutes.

Tags: Mumbai Metro Line 3Aqua LinePM Narendra ModiSamruddhi Mahamarg expresswayMaharashtra DayWAVES Summit
Open in App

Related Stories

LifestyleHappy Maharashtra Day 2025 Wishes: Messages, Quotes, WhatsApp Status and Images to share and Celebrate Maharashtra Din

MaharashtraPM Modi to Inaugurate 4-Day WAVES Summit Hosted by Maharashtra Govt on May 1

NationalKolkata Hotel Fire: PM Modi Condoles Loss of Lives, Announces Rs 2 Lakh Ex-Gratia for Victims' Families

MaharashtraMaharashtra: Will the State Observe Bank Holiday on Akshaya Tritiya and Maharashtra Day?

MumbaiMaharashtra Day 2025: Mumbai Police Ban Flying Activities on May 1, Ceremonial Parade at Shivaji Park

Mumbai Realted Stories

MumbaiMumbai: FIR Registered in Vakola Hit-and-Run Case That Killed Pedestrian After 8-Month Delay

MumbaiDeven Bharti Takes Charge as Mumbai Police Commissioner; Post Returns to ADG Rank After 10 Years

MumbaiMumbai: Central Railway Launches QR Code-Based Timetable System for Mail/Express Trains

MumbaiMumbai: Gold Sales Cross ₹12,000 Crores Nationwide on Akshaya Tritiya; Mumbai MMR Sees ₹800 Crores Trade

MumbaiMumbai: BMC to Complete Road Concretization by May 31