City
Epaper

PM Modi Might Inaugurate BKC-Worli Stretch Of Mumbai Metro Line 3 On May 1

By Lokmat English Desk | Updated: April 30, 2025 13:21 IST

Mumbai Metro Line 3’s phase 2A and the Final stretch of the Samruddhi Expressway are two major infrastructure projects ...

Open in App

Mumbai Metro Line 3’s phase 2A and the Final stretch of the Samruddhi Expressway are two major infrastructure projects of Maharashtra. Prime Minister Narendra Modi will be on a tour to Mumbai on May 1 and may inaugurate these projects. Once these projects become operational, they will benefit many commuters on a regular basis. PM Modi will be visiting Mumbai mainly to inaugurate the World Audio and Visual Entertainment Summit (WAVES), being held at Jio World Centre, BKC. WAVES is a four-day event that aims to bring together all segments of the media and entertainment sector, reported PTI.

 

Mumbai Metro - Aqua Line Phase 2A:

The Commissioner of Metro Rail Safety (CMRS) inspected the Bandra Kurla Complex (BKC) to Aacharya Atre Chowk stretch of this metro line. This is an underground Metro stretch. The Mumbai Metro Rail Corporation Limited (MMRCL) is waiting for CRMS’s clearance certificate. Once the CRMS issues a certificate, this line will be open to the public. Phase 2 of Metro Line 3 passes through:

- Dharavi,

- Sheetla Devi Temple,

- Dadar,

- Siddhivinayak,

- Worli,

- Acharya Atre Chowk.

 

Also Read:  PM Modi to Inaugurate 4-Day WAVES Summit Hosted by Maharashtra Govt on May 1

Samruddhi Mahamarg:

The last section of the 701-kilometre Samruddhi Expressway will make the entire path available to traffic. The last 76 kilometres of the Samruddhi Expressway, which runs from Igatpuri to Amane, Thane, has been constructed by the Maharashtra State Road Development Corporation (MSRDC). The nation's most advanced highway will be completely accessible to cars once it is opened.

 

625 kilometres of the 701-kilometer Mumbai-Nagpur highway is now open. Now that this last section has been added, cars can travel from Mumbai to Nagpur in eight hours.

 

This segment of the expressway is quite an important one because it includes five tunnels spanning 11 km. India’s longest and widest tunnel spanning 7.8 km is built in this phase. With this stretch being operation journey from Igatpuri to Kasara will now just take 8 minutes.

Tags: Mumbai Metro Line 3Aqua LinePM Narendra ModiSamruddhi Mahamarg expresswayMaharashtra DayWAVES Summit
Open in App

Related Stories

MumbaiMumbai: Social Worker Duped of Rs 4 Lakh Using Fake Letter With PM Modi’s Forged Signature; Two Arrested

MumbaiMumbai Metro Line 3 News: Churchgate Station Gate Closed Temporarily, Reopening on April 6

NationalIndia's Defence Exports Touch All-Time High of Rs 38,424 Crore in Financial Year 2025–26

MumbaiMumbai Metro Line 3 to Get Tokyo-Style Underground Walkways, Boosting Connectivity in BKC and Worli

MumbaiMumbai Metro Line 3: B-5 Gate at Vidhan Bhavan Station Reopens After Budget Session

Mumbai Realted Stories

MumbaiDhurandhar 2 Leaked: Maharashtra Cyber Police Registered Case Over Leak of Aditya Dhar’s Film ‘Dhurandhar - The Revenge’ on Telegram

MumbaiMumbai: 25 Motorcycles Set On Fire in Dharavi; Case Registered

MumbaiMaharashtra Cyber Cell Busts Fake Currency Racket Operated via Instagram; Two Arrested

MumbaiMumbai: Man Sets Fire to Nameplate Near Kirit Somaiya’s Office in Mulund After Gym Dispute; Video Surfaces

MumbaiMumbai Accident: Two Youths Killed, One Critically Injured After Private Bus Rams Bike in Mumbra