City
Epaper

Itarsi-Nagpur 4th Railway Line Approved at Rs 5,451 Crore to Boost Connectivity

By Lokmat English Desk | Updated: August 1, 2025 07:38 IST

In a transformative decision set to accelerate the pace of infrastructure development and streamline multimodal logistics, the Cabinet Committee ...

Open in App

In a transformative decision set to accelerate the pace of infrastructure development and streamline multimodal logistics, the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on Thursday approved the much-anticipated fourth railway line between Nagpur and Itarsi spanning 297 km.

The project, with an estimated cost of 5,451 crore, is being executed under the aegis of the PM Gati Shakti National Master Plan dia's flagship initiative for integrated and coordinated infrastructure development.

Also Read | Union Cabinet approves four multi-tracking railway projects across six states at cost of Rs 11,169 crore.

This newly approved fourth line forms a crucial component of the Delhi-Chennai High Density Network and intersects with the Mumbai-Howrah High Density Network at Nagpur, making it a vital node in India's freight and passenger rail eco-system. "With 339 km of track length and 297 km route length, the Itarsi-Nagpur project is more than just an expansion it is a strategic investment in unlocking the economic potential of Central India," said railway officials.

The line will significantly enhance rail capacity, enabling faster, seamless movement of -goods and passengers, reducing congestion on the existing lines, and facilitating better punctuality. The corridor will span three districts in Madhya Pradesh Narmadapuram, Betul, and Pandhurna, and the Nagpur district in Maharashtra, bringing tangible benefits to both states through enhanced connectivity and economic integration.

The project includes robust civil infrastructure 37 stations, 36 major bridges, 415 minor bridges, 2 rail over bridges (ROBs), 74 road under bridges (RUBs), and 4 tunnels -marking a major engineering undertaking.

Major Highlights

Itarsi - Nagpur 4th line (297 km, Rs 5,451 cr)

Part of Delhi-Chennai High Density Network

Intersects with Mumbai-Howrah network at Nagpur

Will enable faster and efficient movement of passenger and goods traffic

Nagpur, Narmadapuram, Betul and Pandhurna to benefit.

Tags: NagpurItarsiRailwayCabinet Committee On Economic Affairs
Open in App

Related Stories

MaharashtraSecurity Breach at Nagpur's Maharaj Bagh Zoo: Man Climbs into Tiger Enclosure

MaharashtraRoof Collapse at Nagpur Railway Station Raises Safety Concerns; No Casualties Reported

NagpurNagpur: 29 Arrested in Late-Night NDPS Raids at Hookah Parlours Under ‘Operation Thunder’

MaharashtraMaharashtra: Tree Fall Disrupts Traffic on Wardha Road, Nagpur for Over Two Hours

NagpurNagpur: Man Arrested at Airport by CISF for Carrying Pistol and Cartridges

Nagpur Realted Stories

MaharashtraWho Is Ashima Mittal? IAS Officer from Jaipur Takes Charge as Jalna District Collector

MaharashtraBeed: Locals Pelt Stones at MSRTC Buses After Autorickshaw Driver Killed in Accident Near Pangari Tanda in Parli

MumbaiMumbai Police Registers First FIR in Mahim for Feeding Pigeons Following BMC Complaint

MaharashtraMahadev Munde Murder Case: Manoj Jarange Demands Immediate Arrest, Says ‘Dignity of Woman Was Compromised’

MumbaiIIT Bombay Student Dies by Suicide After Jumping from Hostel Terrace in Mumbai