City
Epaper

Itarsi-Nagpur 4th Railway Line Approved at Rs 5,451 Crore to Boost Connectivity

By Lokmat English Desk | Updated: August 1, 2025 07:38 IST

In a transformative decision set to accelerate the pace of infrastructure development and streamline multimodal logistics, the Cabinet Committee ...

Open in App

In a transformative decision set to accelerate the pace of infrastructure development and streamline multimodal logistics, the Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on Thursday approved the much-anticipated fourth railway line between Nagpur and Itarsi spanning 297 km.

The project, with an estimated cost of 5,451 crore, is being executed under the aegis of the PM Gati Shakti National Master Plan dia's flagship initiative for integrated and coordinated infrastructure development.

Also Read | Union Cabinet approves four multi-tracking railway projects across six states at cost of Rs 11,169 crore.

This newly approved fourth line forms a crucial component of the Delhi-Chennai High Density Network and intersects with the Mumbai-Howrah High Density Network at Nagpur, making it a vital node in India's freight and passenger rail eco-system. "With 339 km of track length and 297 km route length, the Itarsi-Nagpur project is more than just an expansion it is a strategic investment in unlocking the economic potential of Central India," said railway officials.

The line will significantly enhance rail capacity, enabling faster, seamless movement of -goods and passengers, reducing congestion on the existing lines, and facilitating better punctuality. The corridor will span three districts in Madhya Pradesh Narmadapuram, Betul, and Pandhurna, and the Nagpur district in Maharashtra, bringing tangible benefits to both states through enhanced connectivity and economic integration.

The project includes robust civil infrastructure 37 stations, 36 major bridges, 415 minor bridges, 2 rail over bridges (ROBs), 74 road under bridges (RUBs), and 4 tunnels -marking a major engineering undertaking.

Major Highlights

Itarsi - Nagpur 4th line (297 km, Rs 5,451 cr)

Part of Delhi-Chennai High Density Network

Intersects with Mumbai-Howrah network at Nagpur

Will enable faster and efficient movement of passenger and goods traffic

Nagpur, Narmadapuram, Betul and Pandhurna to benefit.

Tags: NagpurItarsiRailwayCabinet Committee On Economic Affairs
Open in App

Related Stories

MaharashtraNagpur Power Cut Today: Temporary Electricity Disruption on April 8, Check Timings And Affected Areas

MaharashtraNagpur: Body of Unidentified Man Recovered from Futala Lake, Police Launch Investigation

MumbaiMumbai Local Train Scam: 22-Year-Old Uses Forged Pass, Case Filed in Kurla

MaharashtraShaktipeeth Mahamarg New Route Map: Know All About Expansion of Nagpur–Goa Expressway Costing 1 Lakh Crore Now

MaharashtraNagpur Temperature Soars to 40.6 Degree Celsius, Marks Hottest Day of the Season

Nagpur Realted Stories

NagpurKaustubh, Shashwat, Parth, Shravan advance

NagpurDist volleyball teams declared

PunePimpri: Open DP Boxes Used for Illegal Power Supply Near MSEDCL Office

MaharashtraMPSC Results 2024: Solapur’s Vijay Lamkane Ranks First in State, Aarti Jadhav Tops Among Women

PunePune Horror: Pregnant Woman Assaulted by In-Laws Over Money; Case Registered Against Four