City
Epaper

Gujarat: Unit 3 at Kakrapar Atomic Power Plant attains criticality

By ANI | Published: July 23, 2020 8:26 PM

The Kakrapar Atomic Power Plant, Unit-3 (KAPP-3), India's first 700 MWe (megawatt electric) Pressurised Heavy Water Reactor (PHWR) with innovative features, attained criticality on Wednesday.

Open in App

The Kakrapar Atomic Power Plant, Unit-3 (KAPP-3), India's first 700 MWe (megawatt electric) Pressurised Heavy Water Reactor (PHWR) with innovative features, attained criticality on Wednesday.

"A nuclear reactor attains criticality when every nuclear fission event releases a sufficient number of neutrons to sustain an ongoing series of reactions or a self-sustaining chain reaction. Atomic Energy Regulatory Board (AERB) has carried out an exhaustive safety review of various safety aspects to ensure satisfactory compliances to regulatory requirements and granted permission for First Approach to Criticality of KAPP-3 on July 17," the Department of Atomic Energy informed in an official release.

"Due to prevailing COVID-19 situation, the safety review was carried out by working from home, partial working from office and through discussions and meetings over video conferencing. The criticality has been witnessed by the AERB Observer Team posted at Kakrapar Site and by AERB experts at Headquarters through live streaming from KAPP-3 Control Room," the release added.

The third unit of the plant attained its first criticality around 9.36 am on Wednesday.

Prime Minister Narendra Modi congratulated the achievement of Indian nuclear scientists, in a tweet.

The Prime Minister said, "Congratulations to our nuclear scientists for achieving criticality of Kakrapar Atomic Power Plant-3! This indigenously designed 700 MWe KAPP-3 reactor is a shining example of Make in India. And a trailblazer for many such future achievements!"

KAPP-3 is located at the Kakrapar site in Gujarat, where already two 220 MWe PHWRs (KAPS-1 and KAPS-2) are in operation and another 700 MWe PHWR (KAPP-4) is under advanced stage of construction.

( With inputs from ANI )

Tags: Kakrapar atomic power plantAtomic energy regulatory boardNarendra Modi
Open in App

Related Stories

Maharashtra'Remember Bomb Blasts Before Casting Vote': PM Modi In Mumbai's Shivaji Park Rally For Mahayuti Candidates

PoliticsPM Modi Reacts to Potential NCP (SP) Merger with Congress: Is Sharad Pawar Nervous about Baramati?

PoliticsArvind Kejriwal Counters PM Modi’s Critique of AAP Scheme, says “Why Can’t Women Get Free Bus Rides When....?"

PoliticsExclusive Interview of PM Narendra Modi to Rishi Darda: Congress’ Shahzada Speaking Language of Maoists

PoliticsLok Sabha Election 2024: People of Maharashtra Have Been Greatly Supportive of the NDA, Says Prime Minister Narendra Modi

National Realted Stories

NationalScorching heatwaves: Rajasthan's Barmer, UP's Kanpur hottest at 46.9 deg C

NationalAnjali murder case: DCP suspended for 'negligence'; victim's sister attempts suicide

NationalSahara India hits out at makers of 'Scam' series

NationalNow Nagaland poll panel urges Naga body not to abstain from local body polls

NationalAssam: Woman arrested for killing husband & burning his body