City
Epaper

India begins its journey in large scale Battery Energy Storage System for 1000 MW hour project

By ANI | Updated: October 14, 2021 16:40 IST

Central Government has given go ahead for inviting the expression of interest for installation of 1000 MWh Battery Energy Storage System (BESS) as a pilot project.

Open in App

Central Government has given go ahead for inviting the expression of interest for installation of 1000 MWh Battery Energy Storage System (BESS) as a pilot project.

This is the joint effort of both Ministry of New and Renewable energy and Ministry of Power who have been working on this to provide a road map for the installation of the energy storage system in the country.

"In order to support the ambitious goal of achieving 450 GW renewable energy target of Ministry of New and renewable energy by 2030, it is important that it gets duly supported with installation of energy storage systems (battery energy storage system, hydro pump storage plants etc.)," read a statement from the Ministry of Power.

"Solar Energy Corporation of India (SECI), a CPSU under Ministry of New and Renewable energy, has called for the expression of interest for procurement of 1000 MWh BESS. This will be published along with the RFS bid document and the draft comprehensive guideline for procurement and utilization of BESS as a part of generation, transmission and distribution assets and with all ancillary services" the Ministry said.

It further said that this will be discussed in the pre-bid conference scheduled to be held on October 28 2021.

Based on the suggestions and the feedback from various stakeholders, the final RFS document will be floated in the first week of November 2021, along with the final comprehensive guidelines for procurement and utilization of BESS as a part of generation, transmission and distribution assets and with all ancillary services.

According to the statement from the Ministry, India plans to use energy storage system under Renewable energy along with the energy storage system. Energy storage system as grid element to maximize the use of transmission system and strengthening grid stability and also to save investment in the augmentation of transmission infrastructure.

Storage as an asset for balancing services and flexible operation. The system operator i.e. load dispatchers (RLDCs and SLDCs) may use storage system for frequency control and balancing services to manage the inherent uncertainty/variations in the load due to un-generation.

Storage for distribution system i.e. it may be placed at the load centre to manage its peak load and other obligations. As a merchant capacity by the energy storage system developer and sell in the power market.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Central GovernmentMinistry Of New
Open in App

Related Stories

National7th Pay Commission Hike: Central Govt Increase DA by 3% for Employees and Pensioners Ahead of Dussehra

National8th Pay Commission: Employee Unions Demand 2.86 Fitment Factor; Will Salaries See a Real Hike This Time?

NationalAaditya Thackeray On US Tariffs Impact on India; Criticises Central Govt

Business8th Pay Commission: Govt Employees' Salaries May Rise by Up to ₹19,000, Says Goldman Sachs

NationalNew Delhi Railway Station Stampede: Central Govt to Build Holding Zones, Implement AI for Crowd Management

National Realted Stories

NationalDelhi HC quashes FIR against man accused of assaulting doctor, orders community service at same hospital

NationalBihar: Women's post office opens in Motihari, aimed at empowering them

NationalCentre extends significant support by enhancing MSP: Punjab BJP

NationalBihar SIR: It’s all about democratic process

NationalDelhi HC seeks updated report from Rajasthan Police on alleged illegal arrest of two 'minors'