City
Epaper

Railway ministry formulates various schemes for upgradation, modernization of stations

By ANI | Updated: March 25, 2022 18:40 IST

Union Railways Minister Ashwini Vaishnaw on Thursday informed that the ministry has formulated various schemes for upgradation, beautification and modernization of stations in Indian Railways.

Open in App

Railways Minister Ashwini Vaishnaw on Thursday informed that the ministry has formulated various schemes for upgradation, beautification and modernization of stations in Indian Railways.

These schemes for the improvement of railways include Model, Modern and Adarsh Station Scheme.

In a written reply in Rajya Sabha, Vaishnaw said that the 'Model' station scheme was in vogue from 1999 to 2008. Initially, one station per division of Indian Railways was selected under the scheme. In the year 2006, the criteria were revised to include all 'A' and 'B' category stations on the basis of the annual passenger earnings under the scheme.

Under this scheme, 594 stations were selected for degradation, out of these, 590 stations have already been developed, so the remaining four stations, Sambalpur Road station and Alnavar station have been dropped from the scheme, while Ultadanga and Mal Bazar Stations have been closed, he said.

'Modern' station scheme was in vogue from 2006-07 to 2007-08. Under this scheme, 637 stations were selected for up-gradation which have already been developed.

The minister also said that the railway stations are upgraded or modernized under the 'Adarsh' Station scheme based on identified need of providing better-enhanced passenger amenities at stations.

Under the 'Adarsh' Station Scheme, 1253 stations have been identified for development, out of which 1213 stations so far have been developed and the remaining stations are targeted to be developed it by FY 2022-23, Vaishnaw state.

Recently, a new umbrella work scheme of 'Major Upgradation of Railway Station' has been initiated. The work of major upgradation to Bijwasan station has been sanctioned.

The facilities envisaged in this scheme include rebuilding, improvement, augmentation of the station building, congestion-free non-conflicting entry or exit to the station premises, segregation of arrival or departure of passengers, adequate concourse without overcrowding, many others.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Mal bazar stationsMajor upgradation of railway stationAshwini VaishnawAshwini vaishnavInformation technology ashwini vaishnawElectronics and information technology ashwini vaishnaw
Open in App

Related Stories

NationalIndian Railways Facilitates Travel for Over 1 Crore Passengers in Special Trains Between October 1 and 19

MumbaiMumbai-Ahmedabad Bullet Train: Surat–Bilimora Section to Open in 2027, Maharashtra Section by 2029, Says Ashwini Vaishnaw

NationalRailways Approves 4 Major Projects, Will Enhance Key Corridors: Ashwini Vaishnaw

TechnologyWhat is Zoho? Indian Office Suite Application Wins Praise from Ashwini Vaishnaw

MumbaiMumbai Local Trains To Get Automatic Doors After Diwali 2025

National Realted Stories

National45 pilgrims from Hyderabad killed in Saudi bus tragedy: Police Commissioner

NationalBengal STF seizes Rs 5 crore cash from car in New Town, two arrested

NationalGovt committed to strengthening India’s deep-tech and innovation ecosystem: Piyush Goyal

NationalSC seeks Centre’s response on PIL against rising airfares, reduced baggage limit

NationalSaudi Arabia Bus Accident: Bodies of 45 Indians Killed in Crash Cannot Be Sent to India; Saudi Rule Blocks Repatriation