City
Epaper

Thane Metro Line 5 Extended to Ambernath – Check Updated Route & Full Details

By Lokmat English Desk | Updated: June 16, 2025 17:40 IST

Urgent measures are being taken to reduce crowding on Mumbai's local trains in the wake of a devastating train ...

Open in App

Urgent measures are being taken to reduce crowding on Mumbai's local trains in the wake of a devastating train accident in Mumbra that killed four passengers. In response, Dr. Shrikant Shinde, the MP for Kalyan, declared that Metro Line 5, which was initially intended to run from Thane to Kalyan via Bhiwandi, would be extended all the way up to Chikhloli Railway Station in Ambernath, via Ulhasnagar. The metro will now operate between Ulhasnagar and Ambernath, along the Kalyan–Badlapur Road, from Durgadi Naka in Kalyan to Chikhloli Railway Station, said Dr. Shinde said The Times of India.

Main benefits of the extension:

  • Less strain on congested suburban railroads
  • Quicker and safer transportation between Mumbai-Thane and Ambernath-Badlapur
  • Benefits to the environment and fuel economy
  • More efficient traffic flow.

 

Also Read: Mumbai Rains Update: IMD Issues Orange Alert for Heavy Showers Today; Local and Metro Services Hit by Rain Disruption (Watch)

At Chikhloli, an integrated transport hub that combines railway and metro services will be built. Passengers throughout the region will experience more efficient and seamless travel as a result. When finished, Ambernath, Ulhasnagar, and Shahad will all have direct metro connection.

During a high-level meeting chaired by MMRDA Commissioner Dr. Sanjay Mukherjee, key infrastructure projects were reviewed in the presence of local MLAs Balaji Kinikar and Rajesh More, with a focus on expediting their completion. Discussions covered the fast-tracking of the remaining phases of the Kalyan Ring Road project, construction of a unique two-tier Nevali Corridor featuring a flyover and metro viaduct stacked vertically, and the initiation of the tender process for the U-shaped road in East Kalyan. The meeting also addressed the upcoming elevated flyover from Palm Resort to Vithalwadi, which will span the Waldhuni River, and emphasized speeding up work on the access-controlled Navi Mumbai–Badlapur corridor.

Tags: Mumbai Metro Line 5Mumbai Metro 5Mumbai MetroMetroThaneBadlapurUlhasnagarMumbai NewsMaharashtra News
Open in App

Related Stories

MumbaiDhurandhar 2 Leaked: Maharashtra Cyber Police Registered Case Over Leak of Aditya Dhar’s Film ‘Dhurandhar - The Revenge’ on Telegram

MumbaiMumbai: 25 Motorcycles Set On Fire in Dharavi; Case Registered

MumbaiMaharashtra Cyber Cell Busts Fake Currency Racket Operated via Instagram; Two Arrested

MumbaiMumbai: Man Sets Fire to Nameplate Near Kirit Somaiya’s Office in Mulund After Gym Dispute; Video Surfaces

MumbaiMumbai Accident: Two Youths Killed, One Critically Injured After Private Bus Rams Bike in Mumbra

Thane Realted Stories

MaharashtraMaharashtra Student Neelam Shinde Dies in US After 14 Months in Coma; Family Fulfils Her Last Wish

MumbaiMaharashtra Cyber Registers FIR Over Viral Obscene Videos Linked to Ashok Kharat

Maharashtra: SSC, HSC Students to Get Marksheet and Certificate in Single Document

MumbaiMumbai Metro Line 9 Phase 1 Opens: Check Fares and Timings

PunePune Shocker: Drunken Son Attacks 55-Year-Old Mother, Abuses Police; Arrested