City
Epaper

Thane Traffic Update: No Trucks on Ghodbunder Road During Peak Hours; Separate Lane for Heavy Vehicles

By Lokmat English Desk | Updated: September 7, 2024 11:25 IST

Thane Municipal Commissioner Saurabh Rao has unveiled a series of immediate measures to combat the long-standing traffic congestion on ...

Open in App

Thane Municipal Commissioner Saurabh Rao has unveiled a series of immediate measures to combat the long-standing traffic congestion on Ghodbunder Road. These include stricter enforcement of heavy vehicle regulations, the deployment of additional traffic wardens, and the removal of illegal parking and street vendors from service roads. The announcement follows a highly successful meeting with the Justice for Ghodbunder Team, which was attended by MLA Pratap Sarnaik, Manohar Dumbre, TMC Commissioner, PWD officials, MMRDA representatives, and police department officials. The new measures are expected to lead to visible improvements within the next 15 days.

Important decisions being taken which will be implemented from tomorrow 

1.  No Trucks on Ghodbunder road during peak hours morning 6 am to 9 am and evening 5 pm to 9 pm 

2) Heavy vehicles will have a separate lane

3) Dedicated one point contact officer and number for citizens to complaint 

4) Online social media group (Task Force Team )   dedicated team which will include citizens also who are ready to help to resolve issue

5) Potholes to be filled before Ganpati Visarjan and after that concretisation of GB road will happen 

Also Read| Thane Traffic Update: 150 Extra Personnel To Be Deployed By TMC, Police To Control Ghodbunder Road Chaos.

6) Vehicles parked on GB Road and service road will be towed away along with fine

7) 50 police officials with 100 TMC staff to be deployed from tomorrow to control traffic on Ghodbunder Road

8) Mega project for Metro will be completed asap and other projects too.

9) GR passed to divert GB road traffic to Bhivandi internal road 

10) Parking space will be created for Heavy vehicles on Nashik road Ahmedabad Mumbai Road work is under process 

Tags: Thane Traffic UpdateGhodbunder RoadGhodbunder Road Traffic
Open in App

Related Stories

ThaneGhodbunder Road Traffic Update: Long Vehicular Jams Reported On Mumbai-Thane Road Due to Heavy Rainfall (Watch Video)

ThaneThane-Ghodbunder Slip Road to Remain Shut at Night from June 7 to 9 — Check Timings and Alternate Routes

ThaneEid al-Adha 2025: Thane Police Issues Traffic Advisory For Kalyan, Check Road Closure and Alternate Route Details Here

ThaneThane: TMC Launches Mega Deep Clean Drive Across Entire Ghodbunder Road

ThaneThane Water Cut News: 12-Hour Supply Suspension on June 4 in These Areas for Maintenance Work

Thane Realted Stories

MumbaiMumbai Rains: Two Women Injured as Part of Under-Construction Building Collapses Amid Heavy Rainfall

MaharashtraMaharashtra: Husband Kills Wife with Koyta in Chhatrapati Sambhajinagar After Domestic Dispute

MumbaiMumbai’s Powai Lake in Crisis: Centre Acts Amid Rising Pollution Concerns

ThaneThane Metro Line 5 Extended to Ambernath – Check Updated Route & Full Details

Navi MumbaiNavi Mumbai: Several Vehicles Damaged After Vashi Plaza Boundary Wall Collapses Due to Heavy Rain (watch video)