City
Epaper

City still facing effects of rains

By Lokmat English Desk | Published: September 09, 2021 10:30 PM

Aurangabad, Sept 9:Despite 48 hours after the cloudburst on Tuesday night, the city has not recovered from the ...

Open in App

Aurangabad, Sept 9:

Despite 48 hours after the cloudburst on Tuesday night, the city has not recovered from the wreckage. Rainwater is slowly receding in many areas and several roads still have mud accumulation. Water is accumulated in Rozabagh, Mayur Park, N-3, City Chowk and Aurangpura area.

From past two days, the residents of the Shetty's Green Valley society are stuck inside their homes as there is still two to three feet of rain water. All efforts made by the municipal officials to remove water proved futile. Similar situation prevails in N-3, N-4 area. A resident Manoj Bora said that the municipal administration made a delay while providing help to the citizens. There was two to three feet of water inside homes, temples and roads. The corporation says that there are 60 sanitation staff appointed in the ward. But the garbage that came with the water is still present on the road. Residents of the Shivajinagar area also narrated the same ordeal. The residents of Rozabagh demanded to remove the encroachments on nullah to resolved the constant flooding during rainy season.

Tags: Manoj bora
Open in App

Related Stories

AurangabadHeavy water logging, traffic jams in city, water storms houses, shops, vehicular movement comes to a standstill

AurangabadI am an MP, but do not meddle in AMC affairs like Khaire: Karad

Aurangabad Realted Stories

AurangabadMGM Clover Dale School students excel

AurangabadTradition of excellence continues at Winchester

AurangabadGurukul Olympiad School students excel in CBSE 10th

AurangabadAVM continues legacy of success

AurangabadOld pattern to be implemented for RTE seat admissions