City
Epaper

Preparations for the stone lying of electrification work

By Lokmat English Desk | Updated: February 28, 2021 20:45 IST

Aurangabad, Feb 28:The then railway minister laid the stone of the model railway station around five and half ...

Open in App

Aurangabad, Feb 28:

The then railway minister laid the stone of the model railway station around five and half years back but the work was not completed yet. The work of model railway station is still on the papers. Now, the present railway minister Piyush Goyal will lay the foundation stone of the electrification of the single lane.

Aurangabad railway station was including in the model railway station scheme. In the first phase, the new building of the railway station was completed. In the second phase, the old building was to be developed. The then railway minister, Suresh Prabhu laid the foundation stone of this work on July 2, 2015. However, this work was not started until now.

Now, the electrification work of the single lane at the Aurangabad railway station will begin soon. The railway minister Piyush Goyal will come to the city for laying the stone of this work soon. In this backdrop, the various works have been undertaken at the station. The building is being coloured. However, the railway officers were not able to tell when the work of the second phase of the model railway station will start.

MP, Imtiyaaz Jaleel said, the railway gave only the assurances. It is told that the survey work is going on, small railway stations are being developed. Then why, our railway station is not being developed, is the real question. The people are not satisfied. It is only the attempt to show that something is going, he said.

Tags: Piyush GoyalSuresh PrabhuVed prakashShri piyush goyalMinister for commerce and industry and food and consumer affairs
Open in App

Related Stories

NationalTahawwur Rana Extradition: “26/11 Mumbai Attack Accused Will Finally Be Punished In India As Per Our laws,” Says Piyush Goyal (Watch Video)

NationalPiyush Goyal Predicts BJP Victory in Kerala: ‘Lotus Will Bloom with Thumping Majority’

NashikPiyush Goyal to Visit Nashik Amidst Onion Farmers' Demand for Removal of 20% Export Duty

MaharashtraPiyush Goyal Hails Mahayuti's Maharashtra Election Victory as Boost to PM Modi's Vision for Developed India 2047

MumbaiMumbai: Mith Chowky T-Shaped Flyover in Malad Partially Opens to Vehicular Traffic

Aurangabad Realted Stories

AurangabadFour swept away in floods in Latur district; 3 including lady CRPF personnel washed away after rickshaw overturned on flooded bridge

AurangabadRain wreaked havoc in district: 2 lives lost,

AurangabadMaharashtra Geet- mass singing prog postponed due to heavy rain

AurangabadAllocate ₹3,000 crore annually to bridge Marathwada’s irrigation backlog

AurangabadDeputy CM orders for immediate crop damage assessment