City
Epaper

BHEL bags Rs 3,500 crore order from Adani Power for Raipur TPP project

By IANS | Updated: June 5, 2024 20:45 IST

New Delhi, June 5 The Bharat Heavy Electricals Ltd (BHEL) said on Wednesday that it has secured a ...

Open in App

New Delhi, June 5 The Bharat Heavy Electricals Ltd (BHEL) said on Wednesday that it has secured a Rs 3,500 crore order from Adani Power Limited for setting up a 1,600 MW thermal power plant (TPP) at Raipur, Chhattisgarh.

"Bharat Heavy Electricals Limited (BHEL) has received an order from Adani Power Ltd (APL) for setting up the 2x800 MW TPP at Raipur, Chhattisgarh," the public sector giant said in a regulatory filing.

"The nature of the order is supply of equipment – boiler, turbine generator and associated auxiliaries along with control and instrumentation and supervision of erection and commissioning," BHEL said.

Boiler and turbine generator are to be manufactured at BHEL’s Trichy and Haridwar plants, respectively, the company added.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

InternationalIranian delegation led by Parliament Speaker Qalibaf arrives in Islamabad for talks with US

BusinessCommerce Ministry, Ports Department review packaging and shipping challenges amid West Asia crisis

Other Sports'Vaiball' takes over IPL 2026: 15-yr-old Sooryavanshi stuns cricket world with explosive knock

Cricket"Everyone loves him": RR skipper Riyan Parag on Vaibhav Sooryavanshi after RR's win over RCB

Cricket"I try to play the ball and not the bowler": Orange Cap holder Vaibhav Sooryavanshi after POTM-winning performance against RCB

Business Realted Stories

BusinessTripura emerges fastest-growing economies in NE, attracts Rs 2,000 cr investment interest at Bengaluru conclave

Business4.05 lakh PNG connections gasified, not LPG: Petroleum Ministry

BusinessUltra Gas to invest Rs. 900 crores to expand LNG Infra amid West Asia crisis: MD, Maqsood Sheikh

BusinessNITI Aayog releases reports on Ease of Doing R&D​

BusinessTimely intervention cleared 90 pc cargo backlog amid Strait of Hormuz disruptions: Minister