City
Epaper

Key Badvel-Nellore corridor in Andhra Pradesh approved with Rs 3,653 crore outlay

By IANS | Updated: May 28, 2025 16:18 IST

New Delhi, May 28 The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on ...

Open in App

New Delhi, May 28 The Cabinet Committee on Economic Affairs (CCEA), chaired by Prime Minister Narendra Modi, on Wednesday approved the construction of the four-lane Badvel-Nellore corridor at a cost of Rs 3,653.10 crore in Andhra Pradesh.

The corridor, with a length of 108.134 km, will be constructed on the NH-67 on design-build-finance-operate-transfer (DBFOT) mode, the CCEA announced after a meeting here.

The project will generate about 20 lakh man-days of direct employment and 23 lakh man-days of indirect employment.

The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three industrial corridors of Andhra Pradesh -- the Kopparthy Node on the Vishakhapatnam-Chennai Industrial Corridor (VCIC), the Orvakal Node on the Hyderabad-Bengaluru Industrial Corridor (HBIC), and the Krishnapatnam Node on the Chennai-Bengaluru Industrial Corridor (CBIC).

"This will have a positive impact on the Logistics Performance Index (LPI) of the country," said the CCEA in its statement.

The Badvel-Nellore corridor starts from Gopavaram village on the existing National Highway NH-67 in the YSR Kadapa district and terminates at the Krishnapatnam Port Junction on NH-16 (Chennai-Kolkata) in the SPSR Nellore district of Andhra Pradesh.

It would also provide strategic connectivity to the Krishnapatnam Port, which has been identified as a priority node under the Chennai-Bengaluru Industrial Corridor (CBIC).

The proposed corridor will reduce the travel distance to Krishanpatnam port by 33.9 km -- from 142 km to 108.13 km -- as compared to the existing Badvel-Nellore road.

"This will reduce the travel time by one hour and ensure that substantial gain is achieved in terms of reduced fuel consumption, thereby reducing carbon footprint and Vehicle Operating Cost (VOC)," according to the CCEA.

The four-lane Badvel-Nellore corridor project will also induce additional employment opportunities due to an increase in economic activity in the vicinity of the proposed corridor, the Cabinet added.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

InternationalWang Kun Passes Away: Chinese Bodybuilder Dies at 30, Cause Linked to Heart Attack

NationalAndhra: Jagan submits one crore signatures to Guv against privatisation of medical colleges

InternationalUS targets Iran oil network, names India-linked shipping firms

InternationalUS Special Envoy to meet Qatar, Egypt, Turkey officials in Miami on Gaza

Other SportsLa Liga: Villarreal meet Barcelona in vital clash as pressure stays on Real Madrid coach Alonso

Business Realted Stories

BusinessUS targets Iran oil network, names India-linked shipping firms

BusinessIndia-Oman CEPA allows stay duration extension for Contractual Service Suppliers from 90 days to two years: Piyush Goyal

BusinessGujarat leads in timely claim settlement under Ayushman Bharat scheme

BusinessSecurities Markets Code Bill expands SEBI Board, seeks to strengthen governance and consultation process

BusinessArunachal Dy CM reviews hydropower projects to boost state’s energy roadmap