City
Epaper

Halfway There: South Mumbai's East-West Connector Project Makes Progress

By Lokmat English Desk | Published: January 12, 2024 1:16 PM

Mumbai, India: Mumbai's ambitious Shivdi-Worli Connector project, a key infrastructural initiative by the Mumbai Metropolitan Region Development Authority (MMRDA), ...

Open in App

Mumbai, India: Mumbai's ambitious Shivdi-Worli Connector project, a key infrastructural initiative by the Mumbai Metropolitan Region Development Authority (MMRDA), has reached the halfway mark. This critical east-west link, once completed, promises to significantly ease traffic congestion in the city.

The elevated four-lane highway, suspended 27 meters above ground, will provide an access-controlled route bypassing several choked junctions. It will be Mumbai's second double-decker bridge after the Santacruz-Chembur Link Road, further enhancing connectivity within the city.

Despite challenges posed by neighboring older buildings, the project has achieved 50% completion. Key sections include overpasses traversing the Mumbai Harbour Line at Shivdi and the Central and Western lines at Parel and Prabhadevi stations.

The connector aims to drastically reduce travel time between Worli and Shivdi, bringing it down from 40-60 minutes to under 10 minutes. It will connect seamlessly with the Bandra Worli Sealink and the Atal Setu Bridge, improving overall traffic flow across Mumbai.

Currently, progress is underway on the road-over-bridge construction and procurement of girders. MMRDA officials are also diligently addressing the resettlement concerns of residents displaced by the project.

Initially conceptualized as a public-private partnership, the project's execution model was later altered. MMRDA is now spearheading the construction under the Engineering, Procurement, and Construction (EPC) principle.

Tags: WorliMmrdaMumbai Metropolitan Region Development AuthorityPublic private partnership
Open in App

Related Stories

MumbaiMumbai Coastal Road: Project Hits Milestone as Second Super-Large Girder Installed Successfully

MumbaiMumbai Coastal Road: Second Girder to Connect Bandra-Worli Sea Link to be Installed on May 14th

MumbaiMumbai: Worli Crime Branch Seizes Rs 20 Lakh Worth of Mephedrone from Sewri, One Accused Remanded in Custody

MaharashtraMumbai Coastal Road Timing Extended: Lotus and Amarson Garden Junctions Operational for 16 Hours; Details Inside

MaharashtraMumbai Coastal Road: 2,000 MT Bowstring Arch Girder Successfully Installed, Set To Connect Sea Link

Mumbai Realted Stories

MumbaiMumbai Hoarding Collapse: Accused Bhavesh Bhinde Still at Large, Last Tracked in Lonavala

MumbaiMumbai Hoarding Collapse: Two More Bodies Recovered, Death Toll Reaches 16

MumbaiMumbai Metro Line 1 Update: Service Resumes With Full Capacity on Ghatkopar-Versova Route

MumbaiMumbai: BMC Intensifies Crackdown on Unauthorized Hoardings After Ghatkopar Tragedy

MumbaiMumbai: Stampede-Like Situation At Ghatkopar Station After Metro Services Suspended (Watch Video)