City
Epaper

BEML Secures Rs 867 Crore Contract for Making India’s First-Ever Bullet Trains in Bengaluru on Mumbai-Ahmedabad Corridor

By Anubha Jain | Updated: October 15, 2024 19:04 IST

BEML Ltd. has secured an Rs 867 crore contract to design and manufacture two high-speed trainsets for the Mumbai-Ahmedabad ...

Open in App

BEML Ltd. has secured an Rs 867 crore contract to design and manufacture two high-speed trainsets for the Mumbai-Ahmedabad bullet train corridor, featuring eight cars each at Rs 28 crore. The 8-coach train sets that will run at up to 249 kmph. Each of these trainsets will consist of eight cars, with a price tag of Rs 28 crore per train.  The total contract value amounts to Rs 867 crore, covering design costs, one-time development costs, and expenses for jigs, fixtures, tooling, and testing facilities, which will be utilized for future high-speed rail projects in India.

The manufacturing of these trainsets will take place at BEML’s rail coach complex in Bengaluru, with an expected delivery timeline by the end of 2026. The trainsets will feature a fully air-conditioned chair car configuration, offering modern passenger amenities such as reclining and rotatable seats, special accommodations for passengers with limited mobility, and onboard infotainment systems. This project represents a significant step forward for India’s high-speed rail initiatives, introducing the first indigenously designed and manufactured trainsets with a test speed of 280 km/h. 

Tags: Bemlbullet train projectMumbai ahmedabad high speed rail corridor
Open in App

Related Stories

PunePune Gets Bullet Train Connectivity: Mumbai Travel Time to Drop to 48 Minutes, Hyderabad in Just 2 Hours

MaharashtraMaharashtra Budget 2026: Virar, Boisar And Thane To Be Developed Around Bullet Train Corridor, Says CM Devendra Fadnavis

MumbaiMumbai-Ahmedabad Bullet Train Project: Viral Video Highlights Intensive Japan Training for India’s First Bullet Train Drivers (Watch)

NationalNew Year 2026 Gift for Railway Passengers: Ashwini Vaishnaw Announces Bullet Train Launch Date, Vande Bharat Sleeper Route and Fare

MumbaiMumbai-Ahmedabad Bullet Train: Surat–Bilimora Section to Open in 2027, Maharashtra Section by 2029, Says Ashwini Vaishnaw

National Realted Stories

NationalDelhi Secretariat receives bomb threat mail; search on

NationalAssembly election: Sizeable voter turnout of 59% in Assam at 1 pm, 49% in Keralam

NationalNagaland bypoll: Around 60 pc voter turnout recorded in Koridang Assembly seat till 1 P.M.

NationalBengal will choose BJP for development, says Agnimitra Paul

NationalPeople will vote in large numbers for Assam’s development: Himanta Biswa Sarma