City
Epaper

Guard feared dead in Bihar bridge collapse

By IANS | Updated: June 5, 2023 13:25 IST

Patna, June 5 A guard deployed at the four-lane bridge connecting Khagaria and Bhagalpur districts on the Ganga ...

Open in App

Patna, June 5 A guard deployed at the four-lane bridge connecting Khagaria and Bhagalpur districts on the Ganga river that collapsed on Sunday, has gone missing, an official said here.

Vibhash Kumar was hired by the SK Singhla construction company and deployed on Pillar number 11. He had just reached pillar number 11 after parking his motorbike at pillar number 13 when the bridge collapsed.

"We are taking help from the NDRF and SDRF to search for the body. His family has been informed," Akhilesh Kumar, Block Development Officer of Parbatta block in Khagaria district told .

"Had the incident occurred between Monday and Saturday, it could have claimed several lives as over 100 labouers were working on the bridge. The construction company probably realised that the bridge might collapse anytime. Hence, it had asked the workers to leave at 1 p.m. on Sunday. The labourers were also staying in makeshift tents under the bridge but had removed their belongings in time. Hence, there is no casualty of labourers," Kumar said.

"Three guards were deployed at pillar number 11, 12 and 13 but only Kumar reported on duty at Pillar number 11. The other two guards did not come and hence were saved," he said.

"Apparently, the construction company has seen the mishap coming but did not inform the district administration. It needs to ne investigated as to why the company officials allowed the guard to report on duty?

"A large number of passengers also used the waterway to cross the Ganga between Sultanganj and Aguwani Ghat Khagaria. Luckily, the bridge collapsed on Sunday and boats were not sailing at that time. A boat parked on the bank of the river rose to 50 feet due to the waves generated after the structure fell into the water.

"Just imagine the fate of the passengers had the boats come under the impact of the wave," Kumar said.

As per an official of district administration, a massive scale of irregularities and designer fault surfaced during the design and construction of the bridge.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Sk singhlaVibhash kumarNdrfDg ndrfNdrf dg sn pradhanNdrf odraf fire services team deployedNdrf battalionNdrf twitterNdrf control roomNdrf arokkonomNdrf dgNdrf & flood pac
Open in App

Related Stories

ThaneThane Begins Intensive Disaster Training Across Urban and Rural Areas Till April 15

NationalNoida Techie Death Case: NDRF Team Recovers Yuvraj Mehta’s Vehicle After Four Days

ThaneThane Rains: Man Missing After Being Swept Away in Ulhas River During Heavy Downpour

MaharashtraMaharashtra Battles Torrential Rain: Three Dead, 120+ Evacuated in 24 Hours

MaharashtraMarathwada Floods: Dozens Stranded as Heavy Rains Trigger Rescue Operations (Watch Video)

National Realted Stories

NationalTwo sanitation workers die after entering sewer tank in Jaipur's Jhotwara

NationalMaha: Principals to undergo mandatory training for uniform academic structure​

NationalKTR blames BJP for defeat of Women’s Reservation Bill

National'Dark day for India’s democracy;: Kishan Reddy on defeat of women's quota Bill

NationalOdisha CM directs collectors to ensure last-mile fertiliser delivery ahead of Kharif season