City
Epaper

India's power surplus remains underutilised due to limited capacity tie-ups: Manohar Lal Khattar

By IANS | Updated: November 17, 2025 17:50 IST

New Delhi, Nov 17 India is currently a power-surplus nation; however, excess renewable energy capacity remains underutilised due ...

Open in App

New Delhi, Nov 17 India is currently a power-surplus nation; however, excess renewable energy capacity remains underutilised due to limited capacity tie-ups, Union Power Minister Manohar Lal Khattar said on Monday.

Addressing a meeting, focused on Pumped Storage Projects (PSPs), of the consultative committee of the Members of Parliament at Pinnapuram, Andhra Pradesh, the minister said that PSPs can play a critical role by storing this surplus green power and meeting electricity demand during non-solar hours.

On the issue of evaporation losses from PSP reservoirs, the Minister suggested deploying floating solar power projects as a viable solution.

He further underscored the pivotal role of State Governments in facilitating PSP development through timely site allocation, water allocation, and expeditious clearances.

The meeting was attended by Shripad Yesso Naik, Minister of State for Power, members of the consultative committee for the ministry from Lok Sabha and Rajya Sabha, senior officials from the Ministry of Power, and the Central Electricity Authority (CEA).

The Power Minister urged the members to engage with State Governments to consider the withdrawal of charges such as Green Energy cess, water tax, and reservoir lease fees, to accelerate the development of PSPs.

Additionally, the members were also informed that a nationwide PSP potential of approximately 224 GW has been identified.

"Of this, 10 PSPs with a total capacity of around 7 GW have been commissioned, another 10 PSPs of about 12 GW capacity are under construction, and 56 PSPs with a capacity of about 78 GW are at various stages of planning and development," an official statement said.

The members were apprised of the key policy initiatives undertaken by the Government of India to accelerate pumped storage project (PSP) development.

These include the issuance of Guidelines for PSP development outlining modalities for site allotment, exemption from free power and Local Area Development Fund obligations, etc., and a full waiver of Inter-State Transmission (ISTS) charges for 25 years for projects awarded on or before June 30, 2028.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Open in App

Related Stories

EntertainmentAnanya Panday reveals what she is manifesting in 2026

MaharashtraGadchiroli: Pregnant Woman Walks 6 km From Remote Village for Childbirth, Dies

EntertainmentDown with cold, Diljit Dosanjh shares his ‘desi nuska’ with 'besan, ghee and gur'

BusinessIndian auto sector ends 2025 on strong note with decisive YoY growth: Report

NationalUP: Minor dies after being thrown off roof in Bulandshahr, family alleges rape; two held after gunfight with cops

Technology Realted Stories

TechnologyCentre cracks down on X over AI-driven obscene, nude & indecent content

TechnologyBSE celebrates 40 years of Sensex which mirrors India’s economic transformation

TechnologyGame changer: Experts hail approval of 1st oral pill for adults with thalassemia anaemia

TechnologyTechnology to drive space, economic transformation in India: Jitendra Singh

TechnologyPLI scheme for textiles: Last date for fresh applications extended till March 31