City
Epaper

Musk envisions SpaceX Starship's lunar landing by 2021

By IANS | Updated: July 19, 2019 14:40 IST

Uncrewed SpaceX Starship could land on the moon by 2021, following which, a manned moon mission could be a quick possibility, SpaceX founder Elon Musk has said.

Open in App

Musk's conservative estimate for sending people back to the moon aboard a SpaceX vehicle is 2023, a year before NASA hopes to send a crew to visit the moon as part of its Artemis programme, that would also include a female astronaut, CNET reported on Thursday.

Earlier this year, NASA administrator Jim Bridenstine said that the space agency could consider using a third-party rocket like the SpaceX Falcon Heavy for returning to the lunar surface but later clarified that Artemis programme would use NASA's new Space Launch System.

Taking cues from NASA's plans, the multi-billionaire space enthusiast believes that the quickest way back to the moon may be to "go for it, alone" because he knows that the process of qualifying a new spacecraft to fly NASA missions, especially involving crew, could take many months or even years.

While a few key SpaceX projects are working through minor setbacks, on Tuesday a hold-down test firing of a single-engine SpaceX Starship prototype ended with an unexpected fireball.

Even though the prototype did not appear to be seriously damaged, this week's plans for the so-called 'Starhopper' to lift off the ground for the first time and hover before landing were subsequently delayed, the report said.

Earlier this week, Musk's SpaceX and NASA announced that the Dragon explosion was traced back to a leak in the craft's pressurisation system.

While Crew Dragon was initially set to carry its first crew this month, Musk now says that mission looks to be about six months away.

Earlier this year, a SpaceX Crew Dragon spacecraft was destroyed during a test firing.

Though NASA has already tapped Crew Dragon and Boeing's Starliner craft to begin shuttling US astronauts to the International Space Station, Bridenstine told a Senate committee on Wednesday that NASA would not even have an estimate of the cost for its 2024 Artemis mission-ready until 2020.

( With inputs from IANS )

Tags: NasaSpacexJim BridenstineArtemis
Open in App

Related Stories

InternationalNASA Layoffs: 20% or 3,870 Employees to Exit US Space Agency

Space Surprise: Planet Made of Diamonds Found, Five Times Earth’s Size

InternationalNASA Job Cut: Over 2,000 Senior Officials to Exit Due to Trump-Era Budget Cuts

InternationalDOGE Must Audit Elon Musk's Firms, Says Donald Trump in Explosive Post

NationalPM Narendra Modi Interacts With Astronaut Shubhanshu Shukla, First Indian Aboard the International Space Station

टेकमेनिया Realted Stories

TechnologySouth Korean President Lee calls for measures to curb fake news on YouTube

TechnologyDPIIT ieam visits Bengaluru to boost IoT and Deep-Tech innovation

TechnologyIndia's smartphone exports hit record $7.72 billion in Q1FY26, Apple leads with $6 billion

TechnologyIndia’s chip market poised to scale $110 billion by 2030

TechnologyQ1 Earnings Review: Brokerages give mixed outlook, earnings downgrade ratio drops