City
Epaper

SpaceX Crew-3 launch delayed again to Nov 10

By IANS | Published: November 08, 2021 8:51 AM

Washington, Nov 8 NASA has again delayed the upcoming launch of the agency's SpaceX Crew-3 mission to November ...

Open in App

Washington, Nov 8 NASA has again delayed the upcoming launch of the agency's SpaceX Crew-3 mission to November 10 because of weather concerns.

SpaceX noted there was an 80 per cent chance of favourable weather for the new date.

"Following Crew-2's return to Earth, Falcon 9 will launch Dragon's third long-duration crew mission to the Space Station as soon as Wednesday, November 10, weather forecast is 80 per cent favorable for liftoff," the firm said in a tweet.

The Crew-3 launch to the International Space Station was earlier planned for October 31 but was postponed, due to unfavourable weather, to November 3 and then delayed to November 6.

Even as the teams will continue to monitor crew health, Crew-3 astronauts will remain in quarantine at NASA's Kennedy Space Center in Florida.

The SpaceX Crew Dragon spacecraft and Falcon 9 rocket are in good shape and will remain at Launch Complex 39A at Kennedy.

The Crew-3 flight will carry NASA astronauts Raja Chari, mission commander; Tom Marshburn, pilot; and Kayla Barron, mission specialist; as well as ESA (European Space Agency) astronaut Matthias Maurer, who will serve as a mission specialist, to the space station for a six-month science mission, staying aboard until late April 2022.

This is the third crew rotation mission with astronauts on the SpaceX Crew Dragon spacecraft and the fourth flight with astronauts, including the Demo-2 test flight, as part of the agency's Commercial Crew Programme.

Aboard Dragon with the crew will be more than 400 pounds of supplies and hardware, including over 150 pounds of which they will use to conduct experiments aboard the space station. Here is some of the research riding with them into low-Earth orbit.

In addition to the experiments flying with them aboard Dragon, the Crew-3 astronauts are also scheduled to conduct many additional experiments and technology demonstrations during their mission.

Crew-3 is crucial for the testing of new upgrades to the space station's Environmental Control and Life Support System (ECLSS), including the newly installed toilet, the Brine Processing Assembly, carbon dioxide scrubbers, and two new hydrogen sensors slated to arrive aboard a SpaceX Cargo Dragon in late December.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: The Twilight Saga: New MoonTom marshburnKayla barronNasaNational programmeBorish johnsonSpace agencyNational space agencyUs air forcesNational media centerNational aeronautics space administrationAgency channelNational military
Open in App

Related Stories

InternationalSunita Williams: Indian-Origin Astronaut Pilots NASA's Boeing Starliner Lifts Off to Space (Watch Video)

InternationalIndian-Origin Astronaut Sunita Williams to Fly to Space Again on First Crewed Mission of Boeing’s Starliner

NationalLuna Crater in Gujarat Confirmed as Meteorite Impact Site by NASA Studies

TechnologyWatch How Solar Eclipse Looks From Space as NASA Shares Breathtaking Photos and Videos

TechnologyWatch: SpaceX's Falcon9 rocket aces 3 launches to space under 20 hours

Technology Realted Stories

TechnologyStudy finds new therapeutic targets to fight against type 2 diabetes

TechnologyElon Musk congratulates PM Modi, looks forward to invest in India

TechnologyIndustry welcomes resolution of ambiguity on display assembly for mobile phones

Technology10,000 Farmer Producer Organisations to be converted into CSCs

TechnologyEnvironmental tech funding increased in India in last five years: Report