City
Epaper

MJP breaks MIDC water pipeline 7 times in one year

By Lokmat Times Desk | Updated: December 8, 2025 22:20 IST

Chhatrapati Sambhajinagar: While working on the municipal corporation’s new water-supply scheme, the Maharashtra Jeevan Pradhikaran (MJP) damaged the MIDC ...

Open in App

Chhatrapati Sambhajinagar: While working on the municipal corporation’s new water-supply scheme, the Maharashtra Jeevan Pradhikaran (MJP) damaged the MIDC water pipeline seven times in the past year. Each time, this resulted in the disruption of MIDC’s water supply. At Bambatnagar, the pipeline was broken three consecutive times, and MIDC had to bear the repair cost. A bill of ₹14.99 lakh for pipeline repair has been sent by MIDC to MJP.

MJP is currently laying the new water pipeline for the municipal corporation. Another 900 mm diametre pipeline is also being laid by MJP. The work involves laying water pipelines from the Jayakwadi Project in Paithan to Chhatrapati Sambhajinagar city, as well as within city areas.

A dedicated MIDC pipeline supplies water from the Jayakwadi project to the nearby industrial estates at Chikalthana, Waluj, and Shendra 5-star industrial area. For the last two years, MJP has been carrying out excavation work to install the new city water-supply pipeline. Just last week, MJP’s JCB machine broke the MIDC water pipeline at Kanchanwadi, disrupting water supply to Chikalthana MIDC. In the bypass area near Bambatnagar, the MIDC pipeline has been broken three times.

In total, seven MIDC pipelines have been damaged by MJP in one year, causing water supply interruptions to various industrial areas seven times, said MIDC executive engineer Rameshchandra Giri.

He said,“We repeatedly instructed MJP to coordinate with our water-supply section while laying pipelines. However, they ignored our requests, and as a result, their work repeatedly damaged our pipelines.”

Box Item

Bill of ₹14.99 lakh sent

The pipeline in Bambatnagar was broken three times. MIDC has sent MJP a bill of ₹14.99 lakh for the repair work. However, the amount has not yet been paid by MJP, said executive engineer Giri.

Open in App

Related Stories

NationalStone-pelting will not be tolerated, hooliganism will be eradicated from Bengal: Chief Minister Suvendu Adhikari

InternationalUS-Iran Tensions Deepen After Trump’s Fresh Warning to Tehran

NationalWe Are Offering Best Opportunities Available To Take Manufacturing to Next Level: PM Modi in Norway

Other SportsIPL 2026: Ishan deserves all the credit, says Pat Cummins after SRH’s playoff-clinching win over CSK

CricketIPL 2026: Can Chennai Super Kings Still Qualify for Playoffs After Defeat to Sunrisers Hyderabad? EXPLAINED

Aurangabad Realted Stories

AurangabadMan held for sheltering absconding accused in Rs 16 crore sugar factory scam

AurangabadDecomposed body found in Waluj fields

AurangabadCorporator Mehraj Khan and principal granted bail

AurangabadBody found in Godavari River

AurangabadSambhajinagar-Aurangabad Row Revived for Social Media Reels