City
Epaper

MSEDCL orders GPs to pay Rs 156.62 crore dues or face power cuts

By Lokmat English Desk | Updated: September 8, 2021 19:35 IST

Aurangabad, Sept 8:The joint managing director (Aurangabad Region) of Maharashtra State Electricity Distribution Company Limited (MSEDCL), Dr Mangesh ...

Open in App

Aurangabad, Sept 8:

The joint managing director (Aurangabad Region) of Maharashtra State Electricity Distribution Company Limited (MSEDCL), Dr Mangesh Gondavale, has directed all the gram panchayats to clear their power dues in one week or else the company would start disconnecting their power supply. The MSEDCL has to recover Rs 2,127 crore dues against the power supply for the operation of the water supply scheme and the street lights to local self bodies in Marathwada.

The JMD underlined that the state government has already ordered the GPs to pay their current power bills from the Finance Commission funds granted to them.

Gondavale was addressing a video conferencing meeting with the Marathwada region's (all eight districts) deputy chief executive officers (DyCEO) of Zilla Parishads, gram panchayats and MSEDCL chief engineers today. There are dues of Rs 2,127.64 crore upon them. Out of which, the state government has ordered the gram panchayats to pay Rs 156.62 crore bills (pending since April 2021). Hence the current year bills should be cleared in one week or else the power connection will be severed from Monday. He also hoped that the cooperation of public representatives in the issue and pinpointed the need for awareness in this regard.

Lastly, the JMD ordered the MSEDCL subordinates to file a case, if any incident of manhandling or beating MSEDCL personnel is reported.

Tags: Aurangabad Region-RRB- of Maharashtra State Electricity Distribution Company LimitedFinance CommissionMSEDCL
Open in App

Related Stories

MumbaiMumbai: MSEDCL Officials Booked for Criminal Negligence After 17-Year-Old Boy Dies of Electrocution in Bhandup

MaharashtraMSEDCL Revises Power Tariff: Price Reduced for Low-Consumption Mahavitaran Consumers; Check New Rates

Navi MumbaiPower Outage in Navi Mumbai: Kharghar Residents Facing Blackout for Past 20 Hours

MaharashtraKolhapur: MSEDCL Executive Engineer Caught Red-Handed Accepting ₹30,000 Bribe for Power Connections in Ichalkaranji

Navi MumbaiTurbhe Power Crisis: Residents Protest Outages, Say ‘We Can’t Sleep, Our Children Can’t Study’

Aurangabad Realted Stories

AurangabadRevenge-fueled rampage: Young man repeatedly stabbed in stomach

AurangabadUS-Iran War to Continue for Next 6 Months

AurangabadThree assault cases emerge from minor disputes

AurangabadVC to inaugurate rare books exhibition today

AurangabadCivic Chief flags concerns over incomplete hydraulic testing of 2,500-mm pipeline