City
Epaper

Water supply scheme at Shekta stalled

By Lokmat English Desk | Updated: April 11, 2021 20:05 IST

Aurangabad, April 11:The work of the Mukhyamantri Gramin Peyjal Yojana approved three years ago at Shekta in Aurangabad ...

Open in App

Aurangabad, April 11:

The work of the Mukhyamantri Gramin Peyjal Yojana approved three years ago at Shekta in Aurangabad has stalled for the past few years. The Gram Panchayat has repeatedly followed up with the Zilla Parishad in this regard. However, villagers are alleging that the issue is not being addressed.

A scheme costing Rs 1.7 crore under the scheme was approved at Shekta on January 2018. The work of this scheme was inaugurated by MLA Haribhau Bagade. Water will be supplied to the village from a lake at Somthana in Badnapur tehsil. Three years have elapsed since the groundbreaking of the work. But since then there has been no progress. Sarpanch Akshay Babasaheb Wagh said the villagers are facing a severe water shortage. The villagers have to rely on a hand pump for drinking water.

Tags: MLAGram PanchayatPanchayat
Open in App

Related Stories

MumbaiMumbai: Cyber Fraudsters Scam ₹6.25 Lakh from MLA’s PA’s Wife via Social Media

MumbaiBMC Elections 2026: Mumbai Police Seize Fake ‘MLA’ Stickered Car in Vikhroli; Case Filed Against Three

EntertainmentFrom Bigg Boss to K-Dramas: Here are Most Searched OTT Shows on Google in India

NationalUttar Pradesh: 4,271 Voters in a Single House? AI Exposes Shocking Electoral Fraud in Mahoba Ahead of Panchayat Polls

MumbaiMumbai: Man Booked for Misusing State Emblem on Car in Wadala, Posing as MLA

Aurangabad Realted Stories

AurangabadKerosene dealers’ commission doubled

AurangabadSummer or Monsoon? Neither… It’s the New ‘Unsaala’ Season

AurangabadKesar mango production down 70%

AurangabadWater resources department to hike bulk water usage rates

AurangabadThree vehicles torched in Rozebagh; case registered