City
Epaper

Mumbai: CR to operate mega block between Matunga and Mulund on Feb 5

By Lokmat English Desk | Updated: February 4, 2023 20:34 IST

The Central Railway (CR) announced on Saturday that its Mumbai division will operate a mega block on its suburban ...

Open in App

The Central Railway (CR) announced on Saturday that its Mumbai division will operate a mega block on its suburban sections on February 5 to carry out various engineering and maintenance works. On Sunday, the CR will carry out numerous engineering and maintenance work between Matunga and Mulund.

In a statement, the CR said, "The mega block would be operated on the Matunga-Mulund up and down fast lines from 11.05 am to 3.55 pm on February 5."

The down-fast line services from Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.25 a.m. to 3.35 p.m. will be diverted to the down-slow line between Matunga and Mulund stations, halting as per their respective schedule. Meanwhile, the fast trains beyond Thane will be re-diverted on down fast lines at Mulund and will arrive at the destination 15 minutes behind schedule.

The CR further said that the up-fast line services leaving Thane from 10.50 am to 3.46 pm will be diverted on up slow line between Mulund and Matunga halting as per their schedule halts and will be re-diverted on up fast line at Matunga and will arrive destination 15 minutes behind schedule.

The Vadala Road-Mankhurd up and down harbour lines from 11.00 am to 4.00 pm (CSMT - Bandra/Goregaon services) are not to be affected, it said.

The CR said, the down harbour line services to Panvel/Belapur/Vashi leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 10.03 am to 3.54 pm and up harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/ Belapur/Vashi from 9.40 am to 3.28 pm will remain cancelled.

Suburban train services between CSMT and Bandra/Goregaon will run as per schedule during the block period.  Harbour line passengers are permitted to travel via trans harbour/main line from 10.00 am to 4.30 pm  Special suburban trains will run on the Panvel-Mankhurd section during the block period.

"Passengers are requested to bear with the railway administration for the inconvenience caused. These maintenance mega blocks are essential for infrastructure upkeep and safety," the CR said.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tags: Mumbai local mega blockCSMTMatungaMankhurdCentral Railway
Open in App

Related Stories

MumbaiMumbai Local Mega Block On April 19, 2026: Train Services To Be Disrupted On Central, Western and Harbour Lines On Sunday

MumbaiDharavi Redevelopment Project: Govt Authorities Issues Vacate Notice to Matunga Slum Dwellers Ahead of Monsoon

MumbaiMumbai Fire: Blaze Erupts at Scrap Yard on Ghatkopar-Mankhurd Link Road; No Injuries Reported

MumbaiMumbai Local Mega Block On April 12, 2026: Train Services To Be Disrupted On Central, Western and Harbour Lines On Sunday

MumbaiMumbai Local Train News: City To Get India’s First Non-AC ‘Closed-Door’ Local

Maharashtra Realted Stories

Navi MumbaiNavi Mumbai Crime: Man Brutally Killed Near NMMC Headquarters in CBD Belapur, Police Probe On

Mumbai‘Movitrap’: BMC Unveils New Device to Curb Malaria, Dengue, Chikungunya in Mumbai

MaharashtraDhule: Shocking CCTV Video of Missing 18-Year-Old Girl Surfaces; Hypnosis Angle Suspected?

MumbaiMumbai Water Cut: BMC Announces 5% Supply Disruption From April 20 to 27 for Tunnel Maintenance Work; Check Details

MumbaiRohit Shetty House Firing: Mumbai Crime Branch Reveals Shocking Details About Second Shooter