City
Epaper

Indian Railways completes arch bottom of Chenab Bridge

By ANI | Updated: March 15, 2021 23:35 IST

The arch bottom of the Chenab Bridge, the world's highest railway bridge, was completed yesterday, said General Manager of Northern Railways Ashutosh Gangal on Monday.

Open in App

The arch bottom of the Chenab Bridge, the world's highest railway bridge, was completed yesterday, said General Manager of Northern Railways Ashutosh Gangal on Monday.

Speaking to , Gangal said: "Udhampur Srinagar Baramulla Rail link project is a total project of 272 km of which 111 km still remains to be done. Out of the 111 km project, a certain section passes through one of the most challenging territories. The project of this scale and this complexity has not been taken in India so far. Out of this, we have 97 km of tunneling, 66 km of escape tunnels and 7 km of bridges. Rocks are somewhere stable somewhere not. The longest is the Chenab bridge and it has cost us about Rs 1,300 crores. Arch is at a height of 359 metres from the bed of the river. On its completion, it will be the highest rail bridge in the world. That will be a great matter of satisfaction for us to execute this project under the Indian Railways."

"As far as this current project is concerned, the completion of the arch was planned in the first month of March and we are happy that the closing of the bottom portion has been accomplished yesterday i.e. 14 March. Further stages will be completed in the next few days and we are hoping that completion of the arch shall be completed by the end of this month," he said.

Elaborating on the details, he said, "The Katra-Bhal sections which remain to be done have some of the longest tunnels with the longest being 12.7 km. The longest bridges is the Chenab bridge of which the arch is nearing completion."

He further added: "This, in a real sense, is one of the most important connectivity projects ever under-taken because the connectivity by rail to Jammu was never available. This is important because Katra is a major destination for religious tourism with Mata Vaishno Devi temple being located there."

"Passengers can directly travel to and from Srinagar to Kanyakumari. So, this will be a major achievement and I'm very happy to say that we are on track to achieve the target set by Railway Board. We are working on it and we will able to achieve this connectivity in a planned manner soon," he said.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Udhampur srinagar baramulla railjammuRailway BoardKatra
Open in App

Related Stories

NationalPakistan Violates Ceasefire: BSF Trooper Killed, 7 Injured in Jammu Shelling

NationalPakistani Drones Sighted in Jammu, Samba and Pathankot; Indian Military Intercepts

NationalIndian Army Jawan Murali Naik of Ghatkopar Martyred in Pakistani Shelling Along LoC

NationalIndian Airports on High Alert and Shut, Airlines Issue Travel Advisory Amid India-Pakistan Tensions

NationalOperation Sindoor: ‘Pakistan’s Bid To Escalate Negated-Proportionate Response by India,’ Says Indian Army

National Realted Stories

NationalOperation Sindhu: First flight carrying 110 citizens thank Modi govt, Indian embassies on safe evacuation from Iran

NationalFlight carrying 110 Indian citizens evacuated from Iran arrives in Delhi

NationalBengal CM gets pleasure in mocking Ahmedabad plane crash: Amit Malviya

National‘Where protocol paused’: A portrait of love on Hiraben Modi’s birth anniversary

NationalPresident Murmu to attend MP Govt's programme on World Sickle Cell Day tomorrow