City
Epaper

J-K: Budget 2023-24 to give mega infra push

By ANI | Updated: April 11, 2023 22:20 IST

Srinagar (Jammu and Kashmir) [India], April 11 : The budget 2023-24 will provide a major infrastructural push to four ...

Open in App

Srinagar (Jammu and Kashmir) [India], April 11 : The budget 2023-24 will provide a major infrastructural push to four core areas of health, drinking water, power and road connectivity aimed at providing succour to the common people and improving developmental parameters of UT at the national level.

The budget has earmarked funds for providing Functional Household Tap Connections to all 18.36 lakh households of Jammu and Kashmir by 2023- 24 with a minimum of 55 litres per capita per day (LPCD) drinking water supply of prescribed quality (confirming to BIS 10500) on a regular, long-term and sustainable basis.

About 60 water supply schemes are likely to be completed during 2023-24.

To bring efficiency in planning and revenue collection, the government will introduce the digitalization of consumer records and the implementation of an online billing system in the entire Jammu and Kashmir.

The construction of the prestigious Tawi Barrage, an artificial lake project which will boost tourism in Jammu city, will be completed during 2023-24.

According to the budget document, 6,000 Kilometers of blacktopping of roads is expected to be achieved during 2023-24 under all schemes. Besides, 353 new projects worth Rs 1,292 crore have been prioritized to be sanctioned under Rural Infrastructure Development Fund (RIDF)-XXVIII with NABARD funding.

In last year's budget, a safety audit of bridges having completed 20 years was completed and now in this budget Safety audit for the bridges having completed 10 years has to be conducted during 2023-24.

J&K government is also putting efforts into the maintenance of road/bridge assets and also for road safety measures.

The year 2023-24 will see further Improvement in daily hours of power supply with Urban- 24 hours and Rural 22 hours besides a reduction in transformer damage rate, and a drop in Transmission and Distribution/ Aggregate Technical and Commercial (AT&C) losses.

Under Budget 2023-24, there will be an additional length of LT/HT network (1324.073 km) besides renovation and modernization works undertaken at existing 220/132 KV Grid Sub Stations apart from protection/ replacement works at critical towers and insertion of new towers.

To improve power connectivity in remote areas that receive heavy snowfall, Sonamarg will be provided 24x7 power supply during winters with underground cabling through Z-Morh Tunnel besides underground cabling would be done at Nunwan for reliable power supply to holy cave of Shri Amar Nath Ji.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: European Regional Development FundsrinagarjammuutRajouri poonch rangeSrinagar srinagar
Open in App

Related Stories

MumbaiMumbai: Gangster Wanted in Jammu Arrested by Crime Branch in Bandra, Sent to J&K Police

NationalSrinagar Police Launch Major Crackdown on Sale of Rotten Meat, Seize Large Haul in Raids

NationalOperation Mahadev: 3 Pakistani Terrorists Linked to Pahalgam Attack Killed in Srinagar

NationalAmarnath Yatra 2025: First Batch of Pilgrims From Jammu Departed Amid Tight Security

NationalPakistan Violates Ceasefire: BSF Trooper Killed, 7 Injured in Jammu Shelling

National Realted Stories

NationalNo country can survive in isolation: RSS chief

National'Insult to Mahatma Gandhi': Udit Raj on RSS' centenary celebrations

MumbaiDussehra 2025: Know Ravana Dahan Time in Mumbai, Astrological Yogas and Ritual Highlights

NationalIndia’s economy stays resilient in April-September over robust consumption, investments

National100 years of RSS: Mohan Bhagwat says Pahalgam attack revealed India's true friends