City
Epaper

Port Blair airport to get new terminal building by 2021

By ANI | Updated: September 16, 2020 22:45 IST

Veer Savarkar International Airport in Port Blair will soon have a new terminal building to handle the surge in passenger traffic.

Open in App

Veer Savarkar International Airport in Port Blair will soon have a new terminal building to handle the surge in passenger traffic.

The Ministry of Civil Aviation said that more than 65 per cent of project work is completed and the new terminal building of Port Blair is scheduled to be ready by the middle of 2021.

"The airport currently handles 18 lakh passengers annually. Considering the surge in the passenger traffic, Airports Authority of India has undertaken the work for construction of New Integrated Terminal Building at a cost of Rs 700 crores," the ministry said in a release.

With a total built-up area of 40,837 sq m, the new terminal building will be capable to handle 1,200 passengers during peak hours and about 50 lakh passengers annually.

The world-class building is totally air-conditioned and will be equipped with modern passenger facilities with 28 check-in counters, three passenger boarding bridges, five conveyor belts with In-line scan system and state-of-the-art Fire fighting and Fire Alarm system, the ministry said.

"The new passenger terminal building will have three-levels comprising of lower ground, upper ground and first floor. The lower ground floor will be used as remote arrival, departure and service area, the upper ground floor will have entry gate for departure passengers and exit gate for arrival passengers and the first floor as awaiting lounge for international passengers," read the release.

The city side area of the Airport will also be developed with adequate parking facilities for car, taxi and buses along with the landscaping.

"Inspired from nature, the design of the terminal is a shell shaped structure depicting sea and islands. The New Terminal Building with a span of 240 mtrs having two 120 mtr column less spans supported through periphery steel columns, will facilitate columns less large span arrival and departure hall," the release said.

According to the Civil Aviation Ministry, the new terminal building is a structural steel framed building provided with aluminum sheet roofing and cable net glazing all around.

"The entire terminal will also have 100 per cent natural lighting through skylights provided at roof level. Curved shaped Cable Net Glazing will be provided all around the terminal building. This is first time introduced at such a large magnitude at Port Blair Airport," it said.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Ministry Of Civil AviationAirports Authority Of IndiaUnion ministry of civil aviationMinistry of civil aviation and airports authority
Open in App

Related Stories

NationalCivil Aviation Ministry Announces Special Relief Operations Amid Middle East Flight Disruptions

MaharashtraBaramati Plane Crash: AAIB Investigates Delhi-Based VSR Aviation After Ajit Pawar Crash

NationalDense Fog in Northern India May Affect Flights at Selected Airports, Passengers Advised to Stay Updated

NationalAir India Delhi–Mumbai Flight Returns After Engine Shutdown; Aviation Ministry Seeks Detailed Report

MumbaiMumbai Airport Issues Travel Advisory as Dense Fog Impacts Flight Operations in North India

National Realted Stories

National"Despite global turmoil, India continues to move forward on its journey of progress": CM Yogi Adityanath

NationalConspirators won’t harm India if Sanatanis unite: CM Yogi

NationalCM Majhi calls budget key to Odisha's long-term development

National"If action is being taken against infiltrators, why does Mamata Banerjee feel pain"?: BJP MP Kangana Ranaut

NationalBye-election between the poor and the rich, Cong will lose: Karnataka BJP