City
Epaper

ISRO's 13 jinx persists? Chandrayaan-3 launch fixed for July 14

By IANS | Updated: July 6, 2023 21:50 IST

Chennai, July 5 Finally, it is official. India’s third moon mission – Chandrayaan-3 - is slated for July ...

Open in App

Chennai, July 5 Finally, it is official. India’s third moon mission – Chandrayaan-3 - is slated for July 14 afternoon and not on July 13.

The Indian Space Research Organisation (ISRO), in a tweet on Thursday, said: “Announcing the launch of Chandrayaan-3: LVM3-M4/Chandrayaan-3 Mission:The launch is now scheduled for July 14, 2023, at 2:35 pm IST from SDSC, Sriharikota.”

In other words, the LVM3 rocket’s fourth mission is Chandrayaan-3.

The rockets will carry the Chandrayaan-3 spacecraft weighing 3,900 kg or 3.9 ton, which is a tad lower than the total carrying capacity of LVM3 rocket.

Earlier, several media outlets had reported July 13 as the launch date for Chandrayaan-3.

“We have the launch window between July 12 and July 19. The exact date has not been finalised,” a senior Indian Space Research Organisation (ISRO) official, not wanting to be named, had told IANS.

Did the ISRO consider July 13 unlucky and decided the launch on July 14? The space agency officials might say otherwise, but it should be noted since 1993, the ISRO had never launched any one of its rockets - PSLV, GSLV, LVM3 or SSLV- on a 13th.

The ISRO, till now, was not able to explain the absence of the rocket named Polar Satellite Launch Vehicle-C13 (PSLV-C13). After sending up rocket PSLV-C12, the ISRO jumped one number ahead and called its next rocket, which launched Oceansat-2 and six European nano satellites, as PSLV-C14!

Queried about PSLV-C13, a high-ranking ISRO official told IANS: "There is no such rocket designated with that number." He declined to say if ISRO considered 13 an unlucky number.

The ISRO might not have considered July 15 as the launch date for Chandrayaan-3 as Chandrayaan-2 was originally slated for launch on July 15, 2019. However, owing to a technical problem at the last moment, the launch was postponed to July 22, 2019.

The Chandrayaan-3 comprises an orbiter or the propulsion module, a lander called Vikram, and a rover called Pragyan. The orbiter, or the propulsion module as the ISRO named it weighs 2,148 kg, and the lander, including the rover, 1,752 kg.

The main purpose of Chandrayaan-3 is to safely land the lander on the moon soil. Following that, the rover will roll out to do the experiments.

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Indian Space Research OrganisationSdscindiachennaiDisney IndiaAll India Majlis E Ittehadul MuslimeenCommunist Party Of India MarxistIndia TodayAir Asia IndiaAsia IndiaFifa U 17 World Cup IndiaAll India Football Federation
Open in App

Related Stories

NationalChennai ED Office Receives Bomb Threat, Sniffer Dog, BDDS Team Conduct Searches

NationalSchool Holiday in Tamil Nadu on October 27? Chennai and Other Districts Brace for Heavy Rainfall Amid Cyclone Montha

NationalCyclone Montha Live Tracker Map: Cyclonic Storm Likely to Form on October 27 in Bay of Bengal; Check Real Time Updates

NationalChennai Water Pollution: Thick White Foam Covers Pattinapakkam Beach After Excess Water Released From Chembarambakkam Lake

NationalGolden Power: Indian Women Now Hold 24,000 Tonnes of Gold, Outshining Global Investors

Technology Realted Stories

Technology260,000 GPUs to be deployed to build AI factories in S. Korea

TechnologyS. Korea has potential to become global leader in physical AI: Nvidia CEO

TechnologyIndia sets 3 Guinness world records under ‘Swasth Nari, Sashakt Parivar’ campaign

TechnologyIndia redefining global leadership in science and innovation: PM Modi

TechnologyDMRC partners with Mappls MapmyIndia to offer real-time metro updates on Mappls app