City
Epaper

Coastal Road to Bandra Worli Sea Link Delayed; New Completion Timeline Set

By Amit Srivastava | Updated: August 1, 2024 11:35 IST

The southbound lane of the Coastal Road connecting to the Bandra Worli Sea Link (BWSL) was expected to open ...

Open in App

The southbound lane of the Coastal Road connecting to the Bandra Worli Sea Link (BWSL) was expected to open by the end of July, but the project has missed its deadline. The completion of this connector is now anticipated to take an additional couple of months.

In June, Chief Minister Eknath Shinde visited the site and directed officials to expedite work to meet the original deadline. The Bow Arch String Girder for the southbound lanes was installed on April 26, 2024, followed by a second installation on May 15.

Despite these efforts, the opening has been delayed due to heavy rainfall in July, which hampered resurfacing and other tasks. The Brihanmumbai Municipal Corporation (BMC) has indicated that more time is needed to finish the project.

Previously, the distance between the Coastal Road and the Bandra-Worli Sea Link piers was increased from 60 meters to 120 meters to minimize disruptions for local fishermen.

Tags: Mumbai Coastal RoadBandra Worli Sea LinkMaharashtra News
Open in App

Related Stories

MumbaiMira Road Knife Attack: CM Devendra Fadnavis Calls Stabbing a Case of ‘Self-Radicalisation’

MumbaiMumbai Water Cut News: BMC Announces 10% Reduction in Water Supply From May 15 Amid Weak Monsoon Forecast

MumbaiMumbai Fire: Level I Blaze Breaks Out Near Hancock Bridge in Mazgaon

MumbaiMumbai Mira Road Guard Stabbing: US Returnee Accused Watched ISIS Content, Earlier Taught Maths

HealthMumbai Heatwave: Try These 5 Drinks to Keep Your Body Cool During the Hot Summer Season

Maharashtra Realted Stories

MumbaiMumbai Watermelon Death Case: Police Send Fruit and Biryani Samples for Forensic Testing, Record Vendor’s Statement

MaharashtraMaharashtra Makes Marathi Mandatory in All Schools From Classes 1 to 10; Violators Face Rs 1 Lakh Fine

PunePune Crime: 45-Year-Old Killed with Sickle by Nephew Over Land Row

MumbaiMira Road Stabbing Case: People Giving It Hindu-Muslim Angle, Says Shop Owner

MaharashtraMaharashtra: Auto, Taxi Drivers Get Time Till August 15 to Learn Marathi; Pratap Sarnaik Announces 100-Day Relief Period