City
Epaper

Metro services on blue line delayed due to damage to Over Head Electrification wire

By ANI | Updated: June 9, 2022 10:15 IST

Train services on Delhi Metro's Blue line (Dwarka sector 21- Vaishali or Noida Electronic City) were delayed after damage to the Over Head Electrification wire during the morning rush hours on Thursday, according to Delhi Metro Rail Corporation (DMRC).

Open in App

Train services on Delhi Metro's Blue line (Dwarka sector 21- Vaishali or Noida Electronic City) were delayed after damage to the Over Head Electrification wire during the morning rush hours on Thursday, according to Delhi Metro Rail Corporation (DMRC).

It informed that the train services remain normal on all the other metro lines.

Providing an update on the Blue line, the DMRC said the damage to the OHE wire occurred due to a "flash over by an external object" between Yamuna Bank and Indraprastha.

"Blue Line Update: There has been damage to the Over Head Electrification wire due to a flash over by an external object between Yamuna Bank and Indraprastha. Repair work is being done on a war footing. Update on restoration shall be provided soon. The inconvenience is regretted," DMRC tweeted.

Notably, the blue line metro services were disrupted thrice in the past four days including today's glitch. The train services between Yamuna Bank and Indraprastha station of the Blue Line were affected from 6.35 pm to 8 pm on Monday.

According to DMRC, the services were stopped to undertake the repair work of a broken contact wire (part of OHE) on the UP Line (going towards Dwarka) due to some external object (bird) hitting the OHE/pantograph of the train.

During this period, train services were temporarily unavailable between Indraprastha and Yamuna Bank stations due to the absence of OHE resulting from the breakdown of the contact wire due to a bird hit.

The normal train services were continuously available on the rest of the sections of Blue Line during this period in two loops i.e, from Yamuna Bank to Vaishali/NOIDA Electronic City and Indraprastha to Dwarka Sec-21 sections.

Normal services on the entire Blue Line from Dwarka Sec-21 to NOIDA Electronic City/Vaishali were resumed at 8:00 pm.

( With inputs from ANI )

Disclaimer: This post has been auto-published from an agency feed without any modifications to the text and has not been reviewed by an editor

Tags: Delhi metro's blueDelhi Metro Rail CorporationThe delhi metro rail corporationDelhi metro rail transportation
Open in App

Related Stories

NationalDelhi: 3 Killed, Firefighter Injured in Massive Blaze at Delhi Metro Staff Quarters in Adarsh Nagar

NationalDelhi Metro Update: DMRC Announces Revised Timings for Diwali 2025; Check Details Here

NationalDelhi Metro Fight Viral Video: Two Men Exchange Blows Inside Train After Heated Argument

NationalDelhi Metro Fare Hike: DMRC Increases Ticket Prices by Rs 1 to Rs 4 From August 25; Check Details

NationalSnake in Delhi Metro: Reptile Causes Panic As Women Scramble To ‘Escape’ Unwanted ‘Co-Passenger’ (Watch Video)

National Realted Stories

NationalNine policemen get death penalty in Sathankulam custodial death of father-son duo

NationalGujarat: Mansukh Mandaviya mourns deaths of four youths in Porbandar accident​

National"Together for Health, Stand with Science": AIIMS Delhi highlights role in bridging healthcare gaps as World Health Day focuses on science-led care

NationalMaha: Parth Pawar warns Congress of ‘downfall’ over Baramati bypoll move​

NationalKeralam CM Pinarayi Vijayan holds roadshow in Dharmadam ahead of assembly polls